Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Meeka gold output lift at Andy Well: grade, recovery and cost lens for engineers

    October 9, 2026|

    Reviewed by Joe Ashwell

    Meeka gold output lift at Andy Well: grade, recovery and cost lens for engineers

    First reported on Australian Mining

    30 Second Briefing

    Ore from Meeka Metals’ Andy Well underground mine is averaging about one-third above reserve grade, lifting September-quarter gold output 13 per cent to 7237oz from 6424oz in June. The processing plant treated 150,000 tonnes of ore at 95 per cent recovery, indicating strong metallurgical performance as underground stoping ramps up. Higher-than-modelled head grades and stable recoveries will feed directly into unit cost reductions and may justify updates to resource models and mine scheduling.

    Technical Brief

    • Quarter-on-quarter production increased by 813oz relative to the June quarter’s 6424oz.
    • Underground ore source is the Andy Well mine, indicating a shift from historic open-pit production.
    • Higher-than-reserve ore grades imply selective stoping and effective grade control in underground development headings.
    • Stable 95% recovery at rising grades suggests existing plant configuration is not yet recovery‑constrained.
    • Above-model grades will likely trigger updates to block models, stope designs and underground scheduling assumptions.
    • Similar grade outperformance in other narrow-vein underground mines often leads to re-optimised cut-off grades and extended mine life.

    Our Take

    The 95% plant recovery at Andy Well, combined with the separate report that the operation has already hit its 600,000tpa nameplate rate, suggests Meeka Metals is now mainly leveraged to underground stope performance rather than plant bottlenecks for further gold output gains.

    Earlier coverage of Judy North ore development at Andy Well indicates that the current lift in Australian gold production is likely coming from higher-grade stopes entering the mill, which can materially improve unit costs even at relatively modest quarterly ounces.

    Multiple recent pieces in our database on Meeka Metals’ Turnberry depth extensions and the Forrestania (Blue Vein/Bushpig/Razorback) acquisitions imply that Andy Well’s ramp-up is being paired with a pipeline of new Western Australian gold feed sources, giving the company optionality on sequencing and mine life beyond the current underground workings.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Mastermyne Tahmoor mine services award: contract structure and risks for engineers

    Mastermyne Group has secured a new mining services contract with GMT Mining Pty Ltd for the restart and ongoing operation of the Tahmoor underground coal mine in New South Wales. The mine was recently acquired by a consortium of M Group – Mastermyne’s largest shareholder – and Golden Energy and Resources (GEAR), and will be operated by GM3. The deal signals a structured restart pathway for Tahmoor, with clear separation between ownership (M Group/GEAR), operations (GM3) and contracted underground services (Mastermyne).

    Mining
    about 2 hours ago

    FLS Chile copper mine order: HPGR–ball mill flowsheet insights for process engineers

    FLSmidth has secured a major order in Chile to supply core grinding technologies for a new copper grinding line, including high-pressure grinding rolls (HPGR) and a ball mill. The package follows earlier collaborative engineering work on the mine’s expansion and is positioned as the next phase of a long-term process plant partnership with the unnamed customer. For process engineers, the HPGR–ball mill configuration signals continued confidence in energy-efficient comminution flowsheets for large-scale copper operations in the Andean region.

    Mining
    about 2 hours ago

    IMARC 2026: critical minerals, automation and electrification insights for engineers

    Australia’s Resources Minister Madeleine King is using IMARC 2026 in Sydney to position the country as a central hub in global critical minerals supply chains, with a strong focus on lithium, nickel and rare earths projects. The event is expected to draw thousands of delegates and several hundred exhibitors across exploration, mine automation and downstream processing, including OEMs showcasing autonomous haulage fleets and OEM-agnostic fleet management systems. For engineers, the agenda signals continued investment in electrified mobile equipment, high-throughput ore sorting and low-carbon refining technologies.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental