Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    McBains appoints Manchester project director: delivery and cost insights for project teams

    November 9, 2026|

    Reviewed by Tom Sullivan

    McBains appoints Manchester project director: delivery and cost insights for project teams

    First reported on The Construction Index

    30 Second Briefing

    McBains has appointed chartered quantity surveyor Sarah Seasman as project director in its Manchester office to strengthen its North West operations after two years of significant team growth. Seasman joins from Atkins Réalis, where as Regional Director she led commercial and project delivery on Manchester City Council’s £300m+ Our Town Hall programme, Co-op Group’s £120m+ National Retail Refit Programme and Liverpool John Moores University’s £16m Henry Cotton Building. Her track record on complex, high-value refurbishments and estate programmes signals McBains’ intent to target larger public and private frameworks across the region.

    Technical Brief

    • Role is framed as providing strategic commercial and project leadership rather than pure cost control.
    • Chartered quantity surveyor status signals RICS-aligned procurement, valuation and contract administration capability.
    • Experience base is explicitly North West–centric, covering Manchester and Liverpool institutional and civic estates.
    • Exposure to multi-hundred-million-pound frameworks suggests familiarity with multi-lot procurement and call-off mechanisms.
    • Background in major refurbishment programmes implies comfort with live-asset phasing, decant strategies and heritage constraints.
    • Appointment follows “significant growth” in the Manchester team over two years, indicating rising regional workload.
    • For regional clients, move signals deeper bench strength for long-duration, multi-stakeholder estate transformation programmes.

    Our Take

    McBains’ appointment on Manchester City Council’s £300m+ Our Town Hall programme and the Co-op Group’s £120m+ National Retail Refit Programme sits alongside its recent healthcare and education work, such as the £250m Sussex Cancer Centre and the Bradford Royal Infirmary endoscopy unit, signalling a deliberate push into complex public-estate portfolios across the UK.

    The concentration of sizeable projects in Manchester and the wider North West contrasts with national data in our coverage showing new work softening while repair and maintenance rises, suggesting McBains is positioning its Manchester team to capture refurbishment-heavy pipelines rather than relying on greenfield schemes.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers
    Infrastructure
    6 months ago

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers

    Strabag and Group company Züblin have secured the design-and-build structural works for the ABS Gäubahn Nord/Pfaffensteig Tunnel in south-west Germany, centred on an 11km twin-bore rail tunnel linking Stuttgart Airport station directly to the Gäubahn line towards Switzerland. About 9.8km will be driven by two TBMs, with conventional tunnelling for the A8 motorway undercrossing and airport connection, plus a 240m cut-and-cover section, retaining structures, railway underpasses and a grade-separated crossing. A 3km surface section will be upgraded and partially realigned for 200km/h operation, delivered under an integrated project delivery model with Ed. Züblin, Wayss & Freytag and Strabag AG sharing tunnelling, structural and earthworks packages.

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers
    Infrastructure
    8 months ago

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers

    A 271.5‑tonne Herrenknecht Mixshield TBM, Caroline, has started driving a 2.2km electricity cable tunnel with a 4m internal diameter beneath the River Thames in Essex for National Grid’s Grain to Tilbury project, delivered by the Ferrovial BEMO joint venture. The drive will pass through variable Thames estuary ground conditions between 35m‑deep launch and reception shafts of 15m and 12m diameter, with tunnelling continuing into 2026 and overall scheme completion targeted for 2029. The new tunnel will replace the 1969 Thames Cable Tunnel and carry new high‑voltage circuits between Grain and Tilbury substations.

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    9 months ago

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental