Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Lundin Gold’s 1,035 g/t hit at Fruta del Norte: mine life and design notes for engineers

    September 26, 2026|

    Reviewed by Tom Sullivan

    Lundin Gold’s 1,035 g/t hit at Fruta del Norte: mine life and design notes for engineers

    First reported on MINING.com

    30 Second Briefing

    Lundin Gold has reported record grades at its Fruta del Norte district in Ecuador, including a 3-metre Bonza Sur intercept grading 204.26 g/t gold from 140 m, with a 60 cm sub-interval at 1,035.60 g/t, and 5.5 m at 13.75 g/t gold and 50.8 g/t silver from 715 m in hole BLP-2026-483-D2. The newly defined Quebrada Dorada vein system, 2 km south of Bonza Sur, has returned 13 m at 6.53 g/t gold from ~195 m and extends mineralisation over 2.7 km, open to the south. With three rigs at Bonza Sur and two at Quebrada Dorada, Lundin is targeting higher-grade zones adjacent to existing Fruta del Norte South underground development to extend the current 12-year mine life and build on 5.85 Moz of proven and probable reserves.

    Technical Brief

    • Hole BLP-2026-483-D2 at Bonza Sur cut 5.5 m at 13.75 g/t Au and 50.8 g/t Ag from 715 m.
    • Within that interval, 3.2 m from 718 m graded 23.21 g/t Au and 76.93 g/t Ag, indicating strong local grade zoning.
    • Another Bonza Sur hole, BLP-2026-475-D2, returned 5.5 m at 4.59 g/t Au from ~515 m downhole.
    • Bonza Sur mineralisation extends to surface in a large, shallow epithermal system over ~2 km strike.
    • Gold at Bonza Sur is dominated by disseminated mineralisation, implying potential for bulk underground stoping rather than narrow-vein only.
    • Three drill rigs at Bonza Sur are tightening spacing to resolve continuity and geometry of higher-grade shoots.
    • Quebrada Dorada mineralisation occurs in multiple quartz–chalcedony vein generations with hydrothermal breccias, stockworks, native gold and minor sulphides.
    • Drilling at Quebrada Dorada has outlined mineralisation over ~2.7 km along strike, with two rigs currently operating and the system open southwards.

    Our Take

    Lundin Gold’s record reserve base at Fruta del Norte (5.85 Moz at 7.09 g/t) comes as Ecuador’s tax authority is pursuing a US$154 million claim against the company, suggesting that strong asset quality may be critical to absorbing potential fiscal shocks without derailing exploration at Bonza Sur and Quebrada Dorada.

    The new high-grade gold and silver hits at Bonza Sur and Quebrada Dorada build on earlier bonanza intercepts reported in May 2026 at Fruta del Norte, indicating that the broader Fruta del Norte property in Ecuador is emerging in our coverage as one of the few consistently ultra-high-grade gold camps among Latin American projects.

    With seven porphyry centres already identified near Fruta del Norte in July 2026 coverage and now an 8 km mineralised trend tying in Bonza Sur and Quebrada Dorada, Lundin Gold is quietly evolving from a single-mine gold producer into a district-scale gold–copper–silver play, which could alter how Canadian institutions in Toronto and Vancouver value its long-term pipeline.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    North America’s rare earth plants vs engineers: workforce risk lens for mines
    Mining
    about 2 hours ago

    North America’s rare earth plants vs engineers: workforce risk lens for mines

    North America’s rare earth build‑out is racing ahead of its talent pipeline, with more than $10 billion committed to US rare earths and magnets but only about $180 million earmarked for mining education and just 14 accredited mining schools producing roughly 170–285 mining and mineral engineering graduates a year. The DOE’s PROSPECT programme, worth up to $100 million plus a $16 million Planning Prize, aims to double mining and supply‑chain credentials within two years, while proposed Department of War awards would send $32.7 million to Colorado School of Mines and $25 million to South Dakota Mines. Against DOE’s estimate of 6,000 new mining engineers needed over the next decade and a looming “grey tsunami” of 221,000 retirements by 2029, juniors already report junior geologists billing $500–$600 per day and 71% of mining leaders say talent shortages are constraining production.

    Understanding LCT pegmatites: design and recovery risks for lithium project teams
    Mining
    about 2 hours ago

    Understanding LCT pegmatites: design and recovery risks for lithium project teams

    Lithium-cesium-tantalum pegmatite projects are being advanced on simplified grade models that ignore strong mineralogical zoning, with cases such as Mount Marion showing fine-grained spodumene and high mica contents can destabilise DMS media, depress concentrate grades and force costly plant retrofits. At Canada’s Tanco pegmatite, assuming a uniform 60:40 spodumene–quartz intergrowth and overlooking iron and phosphate phases contributed to inefficient plant design and shutdowns. Patriot Battery Metals’ Shaakichiuwaanaan feasibility study similarly relies on a 1D Li₂O recovery formula, without 3D modelling of mica, arsenic and antimony domains that could flag low-density clay-rich zones and DMS underperformance.

    Metals as ‘stock puppets’: price-risk takeaways for mine planners and engineers
    Mining
    about 2 hours ago

    Metals as ‘stock puppets’: price-risk takeaways for mine planners and engineers

    Metals are now trading as “stock puppets”, with Bloomberg Intelligence senior commodity strategist Mike McGlone warning that copper closely shadows US equity moves, potentially falling 20–30% if a “normal” 10% stock market correction occurs. He cautions that current gold enthusiasm looks “too peakish”, arguing investors should “be selling when they’re yelling” rather than treating bullion as a one-way hedge. McGlone links the Fed’s latest rate hike to US checks and balances, expecting equity weakness to be the first clear signal of a shift from inflation to deflation.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental