Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Kier’s new CFO appointment: balance sheet and project delivery lens for engineers

    December 2, 2025|

    Reviewed by Joe Ashwell

    Kier’s new CFO appointment: balance sheet and project delivery lens for engineers

    First reported on The Construction Index

    30 Second Briefing

    Kier Group has appointed Tom Hinton, currently interim chief executive and former chief financial officer of logistics operator Wincanton, as its new CFO with effect from 1st January 2026, succeeding Simon Kesterton after his six-year tenure ends on 31st December 2025. Hinton previously served as group CFO at Infinis Energy, Domestic & General and WE Soda, bringing experience across energy, insurance and mining and chemicals to the UK contractor. The move follows last month’s transition to new chief executive Stuart Togwell, signalling a refreshed leadership team as Kier pursues its medium-term value creation plan and balance sheet strengthening.

    Technical Brief

    • Formal handover date is fixed: Kesterton exits 31 December 2025, Hinton starts 1 January 2026.
    • Kesterton’s tenure explicitly linked to “strengthening our balance sheet”, signalling tighter capital discipline on major frameworks.
    • Board commentary stresses “maintaining strong financial discipline”, implying continued scrutiny of working capital on long-duration infrastructure contracts.

    Our Take

    Within the 112 Infrastructure stories in our database, Kier is one of the more frequently recurring UK contractors, signalling that board-level changes like this are likely to be watched closely by public-sector clients and JV partners on major projects.

    Tom Hinton’s background at Wincanton and Infinis Energy brings exposure to logistics and energy infrastructure, which could be useful as Kier pursues complex UK schemes that blend transport, energy and industrial works rather than pure building contracts.

    With the CFO transition only taking effect from 1 January 2026, Kier has a relatively long runway compared with most UK-listed contractors in our coverage, which typically announce senior finance changes on shorter timetables, suggesting a deliberate handover aimed at maintaining balance sheet discipline through the current projects cycle.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers
    Infrastructure
    about 1 month ago

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers

    Strabag and Group company Züblin have secured the design-and-build structural works for the ABS Gäubahn Nord/Pfaffensteig Tunnel in south-west Germany, centred on an 11km twin-bore rail tunnel linking Stuttgart Airport station directly to the Gäubahn line towards Switzerland. About 9.8km will be driven by two TBMs, with conventional tunnelling for the A8 motorway undercrossing and airport connection, plus a 240m cut-and-cover section, retaining structures, railway underpasses and a grade-separated crossing. A 3km surface section will be upgraded and partially realigned for 200km/h operation, delivered under an integrated project delivery model with Ed. Züblin, Wayss & Freytag and Strabag AG sharing tunnelling, structural and earthworks packages.

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers
    Infrastructure
    3 months ago

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers

    A 271.5‑tonne Herrenknecht Mixshield TBM, Caroline, has started driving a 2.2km electricity cable tunnel with a 4m internal diameter beneath the River Thames in Essex for National Grid’s Grain to Tilbury project, delivered by the Ferrovial BEMO joint venture. The drive will pass through variable Thames estuary ground conditions between 35m‑deep launch and reception shafts of 15m and 12m diameter, with tunnelling continuing into 2026 and overall scheme completion targeted for 2029. The new tunnel will replace the 1969 Thames Cable Tunnel and carry new high‑voltage circuits between Grain and Tilbury substations.

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    4 months ago

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy