Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Kantra’s Nugent copper-gold extension: geometry, resource and design notes for engineers

    October 1, 2026|

    Reviewed by Tom Sullivan

    Kantra’s Nugent copper-gold extension: geometry, resource and design notes for engineers

    First reported on Australian Mining

    30 Second Briefing

    Kantra Copper has intersected 70m at 1.18 per cent copper and 0.24g/t gold from 507m downhole in underground hole 26KVUG0949, extending mineralisation below the current Nugent resource envelope at the Kanmantoo copper mine in South Australia. The company cautions that the interval is not true width due to drill angle, so further step-out and infill drilling plus updated geometry modelling will be needed before resource tonnages and mine design can be revised.

    Technical Brief

    • Geometry uncertainty will force tighter structural and grade-domain modelling before any reserve conversion.
    • Step-out drilling is expected to target both lateral continuity and down-plunge extensions of the Nugent lode.
    • Infill drilling density will need to increase sufficiently to upgrade classification from Inferred to Indicated.
    • Any future mine design changes will likely focus on deeper level access, ventilation and materials handling capacity.
    • For similar brownfield orebodies, such underground step-outs can materially alter cut-off grade and stope sequencing.

    Our Take

    A 70m run at 1.18% copper from 507m depth at Nugent suggests Kantra Copper may be delineating an underground extension that could leverage existing Kanmantoo copper mine infrastructure rather than requiring a greenfield build.

    Within our 1248 Mining stories, copper–gold pieces linked to South Australia are relatively sparse compared with WA and Queensland copper coverage, so this Nugent update stands out as one of the few deeper underground intersections in that state in the recent database.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Epiroc ET55 drill string: design, wear and energy-transfer notes for mine engineers

    Epiroc has launched the ET55 drill string, replacing the long‑running ST58 system and extending its ET next‑generation family with a fully shoulder‑drive connection from top hammer to bit. The ET55 applies the same design principles as earlier ET systems, using a shoulder drive interface along the entire string to improve energy transfer and reduce thread wear compared with conventional threaded couplings. For mine operators running top‑hammer production drilling, the unified shoulder drive geometry should simplify string configuration and potentially extend service life in abrasive ground.

    Mining
    about 2 hours ago

    Redpath on Africa’s mining future: capability, data and safety notes for engineers

    Redpath Africa Operations Executive Pieter Oosthuysen argues that Africa’s mining growth depends on building local technical capability and systems, not just sinking new shafts into high-grade orebodies. He points to integrating digital mine planning tools with mechanised development fleets and rigorous safety management to lift productivity in deep, labour-intensive operations common across the continent. For geotechnical and mining teams, the message is a shift towards long-term skills development, data-driven decision-making and closer OEM–contractor collaboration on complex underground projects.

    Mining
    about 2 hours ago

    Dyno Nobel autonomous blasthole system: design and safety notes for mine engineers

    Dyno Nobel has prototyped a fully autonomous, end-to-end blasthole inspection and loading system that removes personnel from the drill and blast bench, one of mining’s last highly manual and safety‑critical activities. Developed over five years of intensive R&D and unveiled to investors in New York, the technology autonomously orchestrates hole condition inspection, explosives loading and initiation sequencing. For mine operators, this points to tighter control of powder factors and timing, more consistent bench conditions, and reduced exposure of crews around loaded patterns.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental