Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Ivanhoe Electric’s high-grade copper in Arizona: resource and drilling lens for engineers

    November 20, 2026|

    Reviewed by Tom Sullivan

    Ivanhoe Electric’s high-grade copper in Arizona: resource and drilling lens for engineers

    First reported on MINING.com

    30 Second Briefing

    Ivanhoe Electric has reported two significant copper-gold-silver zones at its Gleeson project in southeastern Arizona, including 123.6 metres from 601.7 metres depth grading 0.91% copper, 0.44 g/t gold and 5.27 g/t silver, with a 71.03-metre sub-interval at 1.38% copper. A second hole returned 381.66 metres at 0.34% copper from 587.85 metres, within a breccia and deeper intrusive–skarn–carbonate replacement system extending roughly 800 m north–south by 600 m east–west, still open. Ivanhoe Electric is running two rigs towards 16,000 metres of drilling by year-end, while also advancing its Santa Cruz hydrometallurgical copper cathode project near Casa Grande.

    Technical Brief

    • Gleeson’s upper breccia-hosted copper-gold-silver zone spans ~500 m × 500 m from ~600 m depth.
    • Deeper intrusive, skarn and carbonate-replacement mineralisation is mapped over ~800 m N–S by 600 m E–W.
    • Hole CGD26-TR-008 includes a 16.2 m interval at 1.04% copper within the broader lower-grade run.
    • The same hole also contains a separate 41.51 m interval grading 1.23 g/t gold, indicating metal zoning.
    • Additional holes intersect visible sulphide in carbonate-replacement zones starting around 1,250 m below surface.
    • Ivanhoe Electric holds ~20,000 acres of mineral rights and >2,000 acres of private surface at Gleeson.
    • Eleven drillholes have been completed since November 2025, with full assays for seven and partials for two.
    • Two rigs are currently operating, with total drilling planned to reach 16,000 m by year-end.
    • Santa Cruz, on private land near Casa Grande, is configured for on-site SX–EW cathode production, bypassing smelters.
    • Direct cathode output from Santa Cruz targets US manufacturers, reducing exposure to overseas refining and tariff risk.

    Our Take

    These Gleeson copper intercepts in Arizona come as our database shows multiple 2026 items on Ivanhoe Electric’s nearby Santa Cruz project wrestling with high pre-production capex and water constraints, so additional scale or grade in the district could materially improve financing and development optionality across the company’s US portfolio.

    The strong copper grades reported here contrast with this week’s 6% copper price plunge on the London Metal Exchange, but record Yangshan import premiums and falling Shanghai Futures Exchange inventories in China in the same dataset signal that long-lead US projects like Gleeson and Santa Cruz may be better aligned with physical tightness than with short-term futures volatility.

    With the US Export-Import Bank already signalling up to US$1.1 billion in potential debt support for Ivanhoe Electric’s Santa Cruz copper project in Arizona, further high-grade results in the state strengthen the case that domestic copper assets can underpin US-backed supply chain and critical mineral strategies highlighted in several recent policy-focused pieces in our coverage.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Forrestania’s Edna May restart: contract and ramp-up takeaways for mine planners
    Mining
    about 7 hours ago

    Forrestania’s Edna May restart: contract and ramp-up takeaways for mine planners

    Forrestania Resources is preparing to restart gold production at the Edna May operation in Western Australia, targeting a December gold pour after locking in critical supply and mining services. A long-term sodium cyanide supply contract has been signed with Australian Gold Reagents, and Campbell Gold Haulage has been awarded the ore-loading and crusher-feed contract, securing run-of-mine handling to the primary crusher. With equipment and personnel mobilisation under way, processing continuity and reagent security are largely de-risked ahead of plant ramp-up.

    MinRes appoints new CFO from Perenti: capital and project finance lens for miners
    Mining
    about 7 hours ago

    MinRes appoints new CFO from Perenti: capital and project finance lens for miners

    Mineral Resources has appointed Perenti chief financial officer Michael Ellis as its next CFO, replacing long‑serving finance head Mark Wilson, who is retiring. Ellis, who joins MinRes on 19 May 2027, brings over 20 years’ finance experience, including more than a decade in mining services across contract mining, drilling and maintenance businesses. Executive general manager finance Jonathan Cowper will support the transition, signalling continuity in capital allocation, project financing and cost control across MinRes’ lithium, iron ore and mining services portfolio.

    SA exploration grants: drilling and geophysics outlook for project teams
    Mining
    about 7 hours ago

    SA exploration grants: drilling and geophysics outlook for project teams

    South Australia has awarded over $4.6 million in Plan for Accelerated Minerals (PACE) exploration grants to support up to 19 mineral projects, with the State Government expecting the funding to trigger more than $12 million in drilling and geophysics in 2027. The first-round grants target new copper, critical minerals and gold opportunities across multiple greenfield tenements, rather than brownfield resource extensions. Geologists and contractors can expect increased demand for deep RC and diamond drilling, high-resolution airborne surveys and basin-scale structural interpretation over the next 12–24 months.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental