Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Investigator’s 2662g/t silver hit at Paris: mine design implications for planners

    November 9, 2026|

    Reviewed by Joe Ashwell

    Investigator’s 2662g/t silver hit at Paris: mine design implications for planners

    First reported on Australian Mining

    30 Second Briefing

    Investigator Silver has reported an upgraded intersection of 10m at 2662g/t silver at the Paris project in South Australia, including 4m at 5448g/t from 78m at Paris East, signalling very high-grade mineralisation outside the current mine plan. The standout 1m interval within this zone materially lifts contained metal per vertical metre and could justify re-optimisation of pit shells or underground access in future studies. For geotechnical and mine planning teams, the new data point to potential extensions of the orebody and tighter drilling to refine grade continuity and stope geometry.

    Technical Brief

    • New mineralisation reported specifically from the Paris East sector of the deposit.
    • Intersection depth around 78m suggests potential open-pit or shallow underground access options.
    • Very high silver tenor implies narrow, high-value stopes with tight dilution control requirements.
    • Grade spike intervals will require closer-spaced drilling to model short-range variability and continuity.
    • Geotechnical domains at Paris East may need redefinition if high-grade zones cut existing pit walls.
    • Mine scheduling could shift to prioritise early access to Paris East for cashflow optimisation.
    • Similar narrow, ultra-high-grade silver systems often transition from pit to selective underground mining.

    Our Take

    The shallow start depth of the standout 4m interval at Paris East (from 78m) implies relatively low stripping and development costs compared with deeper silver systems, which can materially improve project economics if continuity is demonstrated along strike.

    With most recent Australia-focused project stories in our database centred on gold or bulk commodities, a high-grade silver project like Paris offers diversification for domestic developers and may attract attention from precious‑metal producers looking to balance gold‑heavy portfolios.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 3 hours ago

    Vivox AI–beSirius supplier reviews: compliance and ESG lens for mine teams

    Vivox AI, known for explainable AI agents in financial crime compliance, has partnered with beSirius, which builds AI tools for assurance and certification readiness in metals and minerals, to automate supplier and counterparty reviews for mining companies, traders and manufacturers. The combined system is aimed at checking evidence for ESG, sanctions, KYC/AML and certification requirements that are currently verified manually via questionnaires and document exchanges. For mine operators, this could materially shorten vendor onboarding cycles and reduce compliance overheads in complex multi-tier supply chains.

    Mining
    about 3 hours ago

    Metso Loesche VRM at Jerritt Canyon: dry grinding design notes for plant engineers

    Metso has secured an order to supply its Metso Loesche VRM dry grinding technology and auxiliary equipment to First Majestic Silver’s Jerritt Canyon Gold Mine restart project in Nevada, marking one of the first mining applications of this vertical roller mill system. The dry VRM setup is expected to replace or reduce conventional wet ball milling and associated dewatering, cutting water use and potentially lowering energy consumption per tonne. Process engineers and plant designers will be watching performance data closely as Jerritt Canyon ramps up under the new flowsheet.

    Mining
    about 3 hours ago

    IGO’s Nova Nickel Operation closure: production outturn and closure lessons for engineers

    IGO Limited has ceased mining and processing at the Nova Nickel Operation in Western Australia, nearly 10 years after first ore, with final reconciliation showing nickel output of 21,340 t, 7% above the top end of life-of-mine guidance. Copper and cobalt production also exceeded guidance, confirming stronger-than-planned metal recovery and orebody performance over the mine’s life. Closure planning, residual processing of stockpiles and potential underground infrastructure reuse will now be key technical considerations for operators and nearby explorers in the Fraser Range.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental