Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    ICSG copper surplus outlook to 2027: supply–demand signals for mine planners

    October 15, 2026|

    Reviewed by Tom Sullivan

    ICSG copper surplus outlook to 2027: supply–demand signals for mine planners

    First reported on MINING.com

    30 Second Briefing

    Global refined copper surplus is projected to jump from 104,000 tonnes in 2026 to 368,000 tonnes in 2027 as smelter and refinery output, led by ramp-ups in Indonesia, India and the EU and stronger operating rates in Chile, outpaces demand. World mine production is expected to grow 1.3% this year and 3.1% in 2027, with recoveries at Grasberg and Kamoa-Kakula and expansions at Oyu Tolgoi, Batu Hijau and Julong easing concentrate constraints. Refined usage is forecast to rise only 1.5% in 2026 and 2.5% in 2027, with China already accounting for 59% of global consumption.

    Technical Brief

    • Refined output growth is split between a 0.4% rise in 2026 and 3.4% in 2027.
    • Ramp‑ups at Indonesian, Indian and EU smelters/refineries plus higher Chilean utilisation drive the 2027 rebound.
    • Mine growth in 2026 is downgraded to 1.3% after cuts to Chile, China and Indonesia guidance.
    • Specific mine contributors include Oyu Tolgoi, Batu Hijau, Malmyz, Julong, Svyatogor, Antamina and Cobre Panama stockpiles.
    • Grasberg and Kamoa‑Kakula remain constrained after 2025 incidents, delaying full concentrate availability recovery.
    • ICSG warns unreported Chinese inventories (state, producer, consumer, trader) can materially distort apparent demand calculations.
    • Forecasts remain sensitive to geopolitical risk, particularly conflict in the Middle East affecting both mine output and end‑use.

    Our Take

    The strong forecast growth in secondary refined copper output from scrap by 2026 implies that smelters in China, the EU, Japan and North America may lean harder on scrap blending, which could erode premiums for some concentrate producers tied to assets such as Grasberg, Antamina and Kamoa-Kakula if mine supply grows as projected.

    In our database, copper dominates the 289 keyword-matched pieces, and the inclusion of rare earths alongside copper cathode in this ICSG-focused item underlines that policymakers in regions like the EU and USA are increasingly treating copper in the same strategic bucket as critical minerals when planning long-term electrification and grid investments.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Expander pivot pins: reducing long-term maintenance costs for mine fleets
    Mining
    about 3 hours ago

    Expander pivot pins: reducing long-term maintenance costs for mine fleets

    Hidden costs from traditional pivot pin maintenance on haul trucks, forestry harvesters and excavators are driving interest in Expander System’s oversized pivot pins with tapered sleeves, according to Nord-Lock Group head of sales Robin Persson. The retrofit design allows installation in worn pivot eyes without line boring or welding, using conical sleeves to create full-surface contact and reduce clearance growth. For mine maintenance teams, this can cut repeated pin replacement shutdowns and lower life-cycle costs on high-load joints such as dump body hinges, loader booms and articulation points.

    Canadian Chrome Company First Nations committee: M&A risk notes for project teams
    Mining
    about 3 hours ago

    Canadian Chrome Company First Nations committee: M&A risk notes for project teams

    Canadian Chrome Company has formed a three-person First Nations steering committee, including former Attawapiskat Chief Theresa Okimaw-Hall and former Marten Falls Chief Lawrence Baxter, to advise on its Ring of Fire chromite, nickel, copper and platinum assets in Ontario’s James Bay Lowlands. The committee will provide Indigenous perspectives to prospective buyers or partners ahead of any sale or merger involving CCC’s 90% interest in the Koper Lake project and 30% in the Big Daddy project. Both projects remain at pre‑PFS stage, with no new economic analysis disclosed.

    Boron One Serbia PEA update: economics and design notes for mine planners
    Mining
    about 3 hours ago

    Boron One Serbia PEA update: economics and design notes for mine planners

    Boron One’s updated PEA for the Piskanja underground boron project in southern Serbia lifts the after-tax IRR to 89% and NPV (10% discount) to US$558.8 million, with unchanged initial capex of US$79.9 million and a sub‑one‑year payback, but shortens mine life to 13 years and trims average annual EBITDA to US$87.7 million. The plan now targets average yearly output of 157,600 tonnes of colemanite, 83,800 tonnes of ulexite and 25,000 tonnes of boric acid, at all‑in sustaining costs of US$231.44 per tonne. The revised study incorporates new geotechnical testing, a 3D resource model by borate type and a binding offtake for at least 25,000 tonnes of boron products per year, subject to permitting and plant qualification.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental