Hinkley Point C fish return tunnel: TBM completion and next works for engineers
Reviewed by Tom Sullivan

First reported on New Civil Engineer
30 Second Briefing
Tunnel boring machine Sarah Guppy has completed a 620m fish return tunnel beneath the Bristol Channel at Hinkley Point C and has been lifted out by crane for redeployment on other works. The dedicated tunnel will route fish safely back to sea from the nuclear plant’s cooling water system, forming part of the intake and outfall marine infrastructure. Retrieval of the TBM frees up the shaft and tunnel interface for follow-on fit-out, hydraulic structures and M&E installation on the cooling water scheme.
Technical Brief
- TBM Sarah Guppy was extracted vertically from the reception shaft using a heavy-lift crawler crane.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Tunnelling
Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.
Construction
Quality control software for construction companies with material testing, batch tracking, and compliance management.
CMRR-io
Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.
HYDROGEO-io
Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.
GEODB-io
Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.


