Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Golden Plateau drilling doubled at Cracow: planning and geotech takeaways

    March 31, 2026|

    Reviewed by Tom Sullivan

    Golden Plateau drilling doubled at Cracow: planning and geotech takeaways

    First reported on Australian Mining

    30 Second Briefing

    Aeris Resources has more than doubled the scale of its Golden Plateau drilling programme at the Cracow gold operations in Queensland after continued high‑grade intercepts from recent holes. The expanded campaign targets extensions of the historic Golden Plateau orebody beneath and along strike of previous workings, aiming to convert near‑mine mineralisation into additional underground reserves. For mine planners and geotechs, the move signals a stronger focus on resource definition drilling around existing infrastructure rather than greenfield step‑out, with potential to extend Cracow’s production profile.

    Technical Brief

    • For similar brownfield gold camps, the case reinforces prioritising orebody extensions around established mining infrastructure over remote step‑outs.

    Our Take

    Our database shows Aeris Resources’ recent $14.5 million divestment of its North Queensland copper assets to Dingo Minerals was framed as freeing capital for Tritton and Constellation, so strong gold results at Golden Plateau near the Cracow mine suggest a deliberate pivot to a copper–gold portfolio rather than copper alone.

    With Golden Plateau in Queensland and Tritton–Constellation in New South Wales, Aeris is consolidating around two Australian hubs, which typically lowers corporate overheads per ounce/tonne and can make it easier to sequence capital between gold and copper projects as market conditions change.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Cemex and sensmore’s Rüdersdorf quarry: AI haulage lessons for mine planners
    Mining
    about 10 hours ago

    Cemex and sensmore’s Rüdersdorf quarry: AI haulage lessons for mine planners

    Cemex and Berlin-based startup sensmore are digitising operations at the 770-year-old Rüdersdorf limestone quarry in Germany using AI-based loading and haulage optimisation. On-board edge devices and radar sensors on wheel loaders and haul trucks feed real-time data into sensmore’s optimisation engine, which recommends bucket fill levels, truck–loader pairing and haul speeds. Early results show reduced idle times and more consistent crusher feed, signalling practical pathways to retrofit AI-driven dispatch and loading control into existing European quarry fleets without full autonomy.

    Mining
    about 10 hours ago

    Multotec spirals at Thaba JV: modular gravity circuit lessons for plant designers

    Multotec has supplied a customised suite of high-performance spiral concentrators to the Thaba JV chromite and PGM project in South Africa’s Limpopo province, providing an integrated gravity separation circuit tailored to the ore’s specific mineralogy. The solution is engineered to boost chromite and PGM recovery while tightening product grade control, with spiral configurations selected to allow rapid reconfiguration between different feed conditions and product specs. For plant designers and metallurgists, the key point is the emphasis on modular, flexible spiral layouts to sustain long-term performance as ore characteristics change.

    Mining
    about 10 hours ago

    Antofagasta copper ramp-up to 2030: design and risk notes for mine engineers

    Antofagasta plans to lift copper output by 30% by 2030, Executive Chairman and CEO Iván Arriagada told delegates at the World Mining Congress 2026, positioning the Chilean producer to meet surging critical minerals demand from the energy transition. The growth will come from brownfield expansions across its existing operations rather than new greenfield projects, implying higher stripping ratios, additional concentrator capacity and incremental tailings and water management upgrades. For engineers, the strategy signals sustained demand for large-scale pit optimisation, process debottlenecking and infrastructure life-extension work in northern Chile.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy