Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Gold Mountain’s Brazil tungsten mine restart: project and supply lens for engineers

    October 8, 2026|

    Reviewed by Tom Sullivan

    Gold Mountain’s Brazil tungsten mine restart: project and supply lens for engineers

    First reported on MINING.com

    30 Second Briefing

    Gold Mountain is evaluating the restart of the historic Malhada do Angico tungsten mine in Brazil’s Seridó Tungsten Province after securing a 12‑month exclusive right over an 858‑hectare mining application from Emprogeo Mining Business EPP, with a potential transaction value up to 3 million reais. The project, a scheelite‑bearing skarn in the Jucurutu Formation and in the same structural setting as the producing Brejuí mine, is already seeing auger drilling of historic tailings for grade confirmation and metallurgical testing. Any restart would target modern production from both old workings and tailings amid Western efforts to diversify tungsten supply away from China, Russia and North Korea.

    Technical Brief

    • Gold Mountain’s exclusive right covers a mining application area of roughly 858 hectares in Seridó.
    • Agreement with Emprogeo Mining Business EPP runs for 12 months, dedicated to technical and commercial due diligence.
    • Potential consideration totals up to 3 million reais (about US$600,000) if the acquisition proceeds.
    • Malhada do Angico’s scheelite occurs in skarn units within the Jucurutu Formation, a regionally mineralised stratigraphic package.
    • Historic mining by Mineração Fluminense targeted scheelite-bearing outcrops during the Second World War, implying shallow legacy workings.
    • The project shares the same broad structural and stratigraphic setting as the producing Brejuí tungsten mine.
    • Brejuí lies about 47 km north of Gold Mountain’s Logradouro tenements, consolidating district-scale tungsten exposure.
    • Gold Mountain has commenced auger drilling of legacy tailings specifically for grade verification and metallurgical characterisation.

    Our Take

    Tungsten appears in only a small subset of our 1862 keyword-matched pieces, so a potential restart in Brazil’s Seridó Tungsten Province positions Gold Mountain in a relatively uncrowded but strategically sensitive supply space compared with more frequently covered battery metals.

    The proximity of Gold Mountain’s Logradouro tenements to the historic Brejuí mine (47 km) suggests scope for shared regional infrastructure and geological understanding, which can materially shorten timelines and reduce exploration risk in north-east Brazil versus a greenfield tungsten play.

    Araxá’s dominance in niobium reserves, noted in our database, underlines how Brazil already anchors critical-metal supply chains; adding revived tungsten output from Malhada do Angico would likely strengthen Brazil’s leverage in future critical-mineral offtake negotiations with the US and other importers.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Titan Mining–US Army graphite plant: integration and supply notes for engineers
    Mining
    about 3 hours ago

    Titan Mining–US Army graphite plant: integration and supply notes for engineers

    Titan Mining’s Empire State Mines has agreed a term sheet with the US Army to lease about 97 acres at Anniston Army Depot, Alabama, for up to 100 years to build a commercial-scale graphite processing plant producing Purified Micronised Graphite (phase I) and, after customer qualification, Coated Spherical Purified Graphite. The facility will sit inside an existing defence installation, using established access, utilities and infrastructure to fast-track construction and integrate with Titan’s Kilbourne graphite concentrate operation in New York. The Army secures a right of first offer for up to 10% of uncommitted annual PMG and CSPG output, without direct taxpayer funding exposure.

    Dutch central bank’s 86-tonne gold shift: liquidity and storage notes for project teams
    Mining
    about 3 hours ago

    Dutch central bank’s 86-tonne gold shift: liquidity and storage notes for project teams

    Dutch central bank De Nederlandsche Bank has shifted 86 tonnes of gold from New York and Ottawa to London between March and August 2026, raising London’s share of its 612.4-tonne reserve from 18.1% to 32.1% while New York and Ottawa each drop to 18.5% and Zeist stays at 30.8%. The move combined selling 59 tonnes in New York and repurchasing in London with physically transporting 27 tonnes under armoured, GPS-tracked security to Zeist, then swapping equivalent London-good-delivery bars to the Bank of England’s vaults. This reallocation prioritises immediate tradability in crisis scenarios and mirrors similar recent relocations by the Banque de France.

    Elizabeth Bay diamond mine revival: project and capex lens for coastal engineers
    Mining
    about 3 hours ago

    Elizabeth Bay diamond mine revival: project and capex lens for coastal engineers

    Dutch private equity firm Kenzoll Capital and Namibian partner MSF Commercials plan a $50 million restart of the Elizabeth Bay diamond mine in the Sperrgebiet, targeting 10.5 million carats of combined onshore and offshore resources and funding exploration for additional minerals. The move follows a 67% collapse in Namibia’s diamond export value from NAD 5.1 billion ($306.9 million) in 2022 to NAD 1.7 billion ($102.3 million) in 2025, which the Bank of Namibia flags as a major drag on growth. For engineers and contractors, the project signals renewed capital for coastal brownfield mine infrastructure and marine-linked resource development in a previously uneconomic De Beers asset.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental