Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Forrestania’s Tampia gold resource: haulage and plant feed lens for mine planners

    October 7, 2026|

    Reviewed by Tom Sullivan

    Forrestania’s Tampia gold resource: haulage and plant feed lens for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Forrestania Resources has defined a maiden 223,300-ounce JORC 2012 gold mineral resource at Tampia in Western Australia, comprising 4.6 million tonnes at 1.50g/t gold using a 0.5g/t cut-off. The deposit, located within trucking distance of the recently acquired Edna May processing plant, includes an indicated component suitable for near- to medium-term mine planning and potential open-pit scheduling. For operators, the grade–tonnage profile supports satellite ore feed scenarios and may influence haulage design, stockpile management and plant throughput strategies at Edna May.

    Technical Brief

    • Tampia is explicitly framed as a satellite ore source to the Edna May processing hub.
    • Trucking-distance linkage to Edna May implies road haulage rather than on-site processing or new plant CAPEX.
    • Satellite feed concept allows Edna May to smooth plant utilisation via flexible stockpile and blending strategies.
    • Haulage design from Tampia to Edna May will need to account for variable ore delivery rates and cut-off sensitivity.

    Our Take

    With Tampia now defined at 4.6Mt @ 1.5g/t Au, Forrestania Resources appears to be building a multi-asset feed base for the Edna May processing plant, complementing the Johnson Range ore reserve and the recently announced right to process up to two million tonnes of third‑party ore.

    Our database shows several recent Forrestania items focused on restarting the Edna May Gold Project and contracting MEGA Resources for Johnson Range, suggesting Tampia could be sequenced as an additional satellite source to smooth mill utilisation and reduce unit processing costs in Western Australia.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Titan Mining–US Army graphite plant: integration and supply notes for engineers
    Mining
    about 4 hours ago

    Titan Mining–US Army graphite plant: integration and supply notes for engineers

    Titan Mining’s Empire State Mines has agreed a term sheet with the US Army to lease about 97 acres at Anniston Army Depot, Alabama, for up to 100 years to build a commercial-scale graphite processing plant producing Purified Micronised Graphite (phase I) and, after customer qualification, Coated Spherical Purified Graphite. The facility will sit inside an existing defence installation, using established access, utilities and infrastructure to fast-track construction and integrate with Titan’s Kilbourne graphite concentrate operation in New York. The Army secures a right of first offer for up to 10% of uncommitted annual PMG and CSPG output, without direct taxpayer funding exposure.

    Dutch central bank’s 86-tonne gold shift: liquidity and storage notes for project teams
    Mining
    about 4 hours ago

    Dutch central bank’s 86-tonne gold shift: liquidity and storage notes for project teams

    Dutch central bank De Nederlandsche Bank has shifted 86 tonnes of gold from New York and Ottawa to London between March and August 2026, raising London’s share of its 612.4-tonne reserve from 18.1% to 32.1% while New York and Ottawa each drop to 18.5% and Zeist stays at 30.8%. The move combined selling 59 tonnes in New York and repurchasing in London with physically transporting 27 tonnes under armoured, GPS-tracked security to Zeist, then swapping equivalent London-good-delivery bars to the Bank of England’s vaults. This reallocation prioritises immediate tradability in crisis scenarios and mirrors similar recent relocations by the Banque de France.

    Elizabeth Bay diamond mine revival: project and capex lens for coastal engineers
    Mining
    about 4 hours ago

    Elizabeth Bay diamond mine revival: project and capex lens for coastal engineers

    Dutch private equity firm Kenzoll Capital and Namibian partner MSF Commercials plan a $50 million restart of the Elizabeth Bay diamond mine in the Sperrgebiet, targeting 10.5 million carats of combined onshore and offshore resources and funding exploration for additional minerals. The move follows a 67% collapse in Namibia’s diamond export value from NAD 5.1 billion ($306.9 million) in 2022 to NAD 1.7 billion ($102.3 million) in 2025, which the Bank of Namibia flags as a major drag on growth. For engineers and contractors, the project signals renewed capital for coastal brownfield mine infrastructure and marine-linked resource development in a previously uneconomic De Beers asset.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental