Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Forrestania million‑ounce milestone: MacPhersons pit design notes for planners

    June 2, 2026|

    Reviewed by Tom Sullivan

    Forrestania million‑ounce milestone: MacPhersons pit design notes for planners

    First reported on Australian Mining

    30 Second Briefing

    Forrestania Resources has issued a maiden JORC mineral resource estimate for the MacPhersons gold deposit in Western Australia, comprising 1.84 million tonnes at 1.25 grams per tonne and lifting its global gold inventory to 1,007,800 ounces. Chairman David Geraghty said the MacPhersons addition pushes the company past the one‑million‑ounce milestone across its portfolio. For mine planners and geotechnical teams, the new tonnage and grade provide a basis for pit optimisation, geotechnical drilling design and sequencing studies at MacPhersons.

    Technical Brief

    • MacPhersons is reported as a maiden mineral resource estimate, implying no prior JORC-compliant dataset.
    • The deposit sits within Forrestania’s Western Australian gold portfolio, enabling shared regional infrastructure and logistics planning.
    • Classification as a JORC mineral resource allows formal conversion workflows to ore reserves once modifying factors are defined.
    • Forrestania now treats MacPhersons as an additional standalone gold asset, not merely satellite tonnage.
    • Public disclosure of an MRE triggers typical follow-on work: detailed drilling, metallurgical testwork and geotechnical characterisation.

    Our Take

    Forrestania Resources has been on an acquisition streak in Western Australia – with recent moves at Newington, Hyden and Johnson Range – so the MacPhersons million‑ounce milestone likely strengthens a multi‑asset gold development narrative rather than a single‑deposit story.

    At 1.84Mt @ 1.25g/t, MacPhersons sits in the lower‑grade end of the gold projects in our database, which typically pushes operators towards scale, satellite feed or toll‑treating strategies rather than a standalone high‑margin underground mine.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 5 hours ago

    Sandvik underground fleet at Kamoa-Kakula: haulage and maintenance lens for engineers

    Sandvik has secured an order from Kamoa Copper SA for 19 Toro® underground trucks and loaders for the Kamoa-Kakula Copper Complex in the Democratic Republic of the Congo, taking the site’s Sandvik underground fleet to more than 100 units. The equipment will support one of the world’s largest underground Sandvik fleets at a single mine, operated by the Ivanhoe Mines–Zijin Mining joint venture. For engineers, the scale signals sustained high-volume, trackless underground haulage and significant long-term demand for OEM parts, maintenance capacity, and fleet management systems.

    Mining
    about 5 hours ago

    Metso Durarok™ primary sizer at Yenipazar mine: design and throughput notes for engineers

    Metso has secured a €25 million order from Aldridge Mineral Madencilik A.Ş., part of CVK Mining, to supply key minerals processing equipment for the Yenipazar polymetallic mine in Türkiye, including one of its first Durarok™ primary sizers. The package, booked in Metso’s Minerals segment for 2026, will support primary crushing and downstream processing for a deposit containing multiple base and precious metals. For engineers, early adoption of the Durarok™ sizer at Yenipazar will be a reference case for hard-rock primary sizing performance in Turkish conditions.

    Mining
    about 5 hours ago

    Volvo Autona / earth autonomous haulage: key takeaways for mine planners

    Volvo Autonomous Solutions has launched Autona / earth, a commercial autonomous haulage system for mines and quarries built around an autonomous Volvo FH truck and an in-house developed virtual driver. The package is delivered as Transport-as-a-Service, with Volvo providing the vehicle automation stack, site infrastructure, operational support and maintenance rather than selling trucks outright. The system is designed to plug into existing mine haulage operations, signalling a shift towards OEM-managed autonomous fleets where OEMs assume more responsibility for uptime and performance.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental