Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Falcon’s $100M Guinea ICSID claim: Lola graphite project risks for mine planners

    March 17, 2026|

    Reviewed by Joe Ashwell

    Falcon’s $100M Guinea ICSID claim: Lola graphite project risks for mine planners

    First reported on MINING.com

    30 Second Briefing

    Falcon Energy Materials has launched a US$100 million arbitration claim at the World Bank’s ICSID, alleging Guinea illegally expropriated its Lola graphite project by a May 2025 presidential decree that revoked 51 mining and exploration permits, including its 2019 exploitation licence. The Lola deposit hosts about 54 million tonnes at 3.98% graphitic carbon (2.15 million tonnes contained), previously underpinning a 2022 feasibility study with US$185 million capex and a US$73 million Morocco processing plant, targeting coated spherical purified graphite. Falcon, now Abu Dhabi-based, recently raised C$25 million to fund legal costs while advancing a Moroccan pilot plant and EIA for full-scale anode material production.

    Technical Brief

    • Arbitration is being pursued under the Guinea–UAE bilateral investment treaty at the World Bank’s ICSID.
    • The May 2025 presidential decree cancelled more than 50 exploration and mining permits countrywide, across multiple commodities.
    • Falcon’s Lola exploitation licence, originally granted in 2019, was revoked without prior formal notice, according to the company.
    • Guinea’s actions reportedly included freezing bank accounts linked to entities affected by the decree, constraining on-the-ground activities.
    • Falcon alleges the decree conflicts with Guinea’s 2011 mining code and the licence terms agreed at award.
    • In parallel, Falcon is constructing a graphite pilot plant in Morocco, with first output targeted H2 next year.
    • An environmental impact assessment is being prepared for a full-scale Moroccan graphite facility integrated with upstream feed.
    • Desjardins Capital Markets currently treats Lola as non-core, assigning zero value to the asset in its valuation model.

    Our Take

    Within our 36 graphite-tagged pieces, Guinea rarely appears alongside downstream assets like Falcon’s planned Morocco processing facility, suggesting this integrated mine-to-anode model is still unusual for West African graphite plays compared with more typical single-site projects in jurisdictions like Brazil and Canada.

    The Lola project’s after-tax NPV of $1.3 billion versus capex of $185 million places it at the higher-return end of graphite projects in our database, which likely explains Falcon’s willingness to pursue a $100-million arbitration rather than pivot quickly to alternative assets.

    Guinea’s repossession of 51 mining licences contrasts with the generally more stable permitting environments seen in other bauxite- and graphite-rich regions in our coverage, signalling that political and regulatory risk may now be a more material factor in West African critical mineral project valuations than in competing hubs such as the Brazilian state of Goias.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Fortescue copper–arsenic Toowong Process: project economics lens for mine planners
    Mining
    about 9 hours ago

    Fortescue copper–arsenic Toowong Process: project economics lens for mine planners

    Fortescue has sold more than 40 tonnes of copper concentrate treated with its patented Toowong Process, a low-temperature, low-pressure hydrometallurgical circuit that removes arsenic from copper concentrates. Developed and tested over four years after Fortescue acquired the technology, the process targets a longstanding penalty element constraint that limits saleability of high-arsenic ores. Commercial deployment could materially change project economics for arsenic-rich copper deposits, enabling miners to convert previously marginal or stranded resources into exportable concentrate streams.

    Core’s Finniss lithium: 92 m Blackbeard hit and what it means for mine design
    Mining
    about 9 hours ago

    Core’s Finniss lithium: 92 m Blackbeard hit and what it means for mine design

    Core Lithium has reported its longest mineralised downhole intersection at the Blackbeard prospect within the Finniss lithium operation in the Northern Territory, with diamond drillhole NMRD104 returning 92m at 1.25 per cent Li₂O, including 73m at 1.45 per cent Li₂O. The thick, continuous spodumene-bearing pegmatite materially extends known mineralisation at depth and along strike, improving the potential for larger, more coherent underground or bulk open-pit mine designs. For resource modellers and geotechs, the interval supports tighter geological domaining and may justify updated pit shells and geotechnical slope assessments.

    South32 Australian manganese output lift: throughput takeaways for mine planners
    Mining
    about 9 hours ago

    South32 Australian manganese output lift: throughput takeaways for mine planners

    South32 lifted Australia Manganese saleable output 15 per cent quarter-on-quarter to 902,000 wet metric tonnes in the September 2026 quarter, driven by higher utilisation of the primary processing circuit, while keeping full-year production guidance unchanged across its operations. Alumina production also increased, and the company is continuing capital deployment into base metals growth projects, including copper and zinc developments. For mine planners and process engineers, the numbers signal more stable plant throughput assumptions and sustained demand for processing circuit optimisation and debottlenecking work.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental