Esh’s Middlesbrough homes delivered early: infrastructure and phasing notes for engineers
Reviewed by Joe Ashwell

First reported on The Construction Index
30 Second Briefing
Esh Construction has completed the £56m Hillside Gardens scheme in Grove Hill, delivering 296 affordable homes two years ahead of programme as part of Thirteen Group’s £110m plan for more than 540 units across Middlesbrough. The development, funded via Thirteen’s Strategic Partnership with Homes England and a £2.8m Brownfield Housing Fund grant approved by Tees Valley Combined Authority, replaces housing cleared over a decade ago with two‑ to four‑bedroom houses and bungalows for affordable rent. Esh’s Lumsden & Carroll division delivered roads, sewers and plot works, while its civil engineering team executed Section 278 works including a new signalised junction on Keith Road, multi‑modal paths, surfacing and kerb realignment.
Technical Brief
- Section 278 works delivered a new signalised junction on Keith Road, altering local traffic geometry.
- Multi-modal pathways were constructed for combined pedestrian and cyclist use, integrating with the new junction layout.
- Lumsden & Carroll completed on-site roads and sewers, tying housing drainage into existing off-site networks.
- Plot works included installation of utilities, hard paving, topsoiling and block paving to all 296 units.
- Hillside Gardens is the third Middlesbrough scheme with Thirteen, following 105 homes at Kedward Avenue.
- Union Village in Gresham added a further 145 homes, giving 246 units delivered before Hillside Gardens.
- Tees Valley Combined Authority approved a £2.8m Brownfield Housing Fund grant specifically to unlock this cleared site.
- Design and delivery involved IDPartnership Northern, 3e Consulting Engineers, Elliott Associates and ONE Environments in a multi-disciplinary team.
Our Take
Esh Construction appears frequently in our Infrastructure coverage not just for new-build projects like Hillside Gardens in Middlesbrough but also for asset renewal work such as the Drypool and Weel bridge refurbishments, signalling a business model balanced between regeneration housing and municipal civils frameworks in northern England.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Construction
Quality control software for construction companies with material testing, batch tracking, and compliance management.
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
QCDB-io
Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.


