Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Equinox sells Brazilian operations to CMOC: portfolio and capex shift for mine planners

    December 15, 2025|

    Reviewed by Joe Ashwell

    Equinox sells Brazilian operations to CMOC: portfolio and capex shift for mine planners

    First reported on MINING.com

    30 Second Briefing

    Equinox Gold has agreed to sell its entire Brazilian portfolio — the Aurizona and RDM mines plus the Bahia complex (Fazenda and Santa Luz) — to China’s CMOC Group for over US$1 billion, including US$900 million cash on closing and up to US$115 million in contingent payments tied to production. The divested assets were guided to produce 250,000–270,000 oz. of gold in 2025, while Equinox’s refocused portfolio will centre on the Greenstone (220,000–260,000 oz.), Valentine (175,000–200,000 oz. at full run-rate) and Mesquite (85,000–95,000 oz.) operations. Proceeds will be used to retire US$800 million of debt, cutting interest costs and freeing capital for expansions at Valentine, Castle Mountain and Los Filos, with group output targeted at 700,000–800,000 oz. next year.

    Technical Brief

    • Transaction consideration is US$900 million cash at closing plus up to US$115 million contingent on production.
    • Brazilian package comprises 100% interests in Aurizona (Maranhão), RDM (Minas Gerais), and the Bahia complex (Fazenda and Santa Luz).
    • Equinox plans to fully repay a US$500 million term loan and a US$300 million Sprott facility from proceeds.
    • Immediate debt retirement is expected to materially cut interest expense and lift per‑share operating cash flow.
    • El Limón and Libertad in Nicaragua enter the growth pipeline via Equinox’s earlier US$1.8 billion Calibre Mining acquisition.

    Our Take

    Within our 299 Mining stories, there are only a handful of large single-transaction gold M&A deals above the US$1 billion mark, so Equinox Gold’s Brazil sale stands out as one of the more sizeable balance-sheet resets in the gold space this year.

    Using over US$800 million of the proceeds to clear term debt and Sprott obligations positions Equinox’s remaining assets such as Greenstone, Mesquite and Castle Mountain to fund expansion or optimisation with less reliance on high-cost project finance, which has been a recurring constraint in other gold items in our database.

    CMOC Group’s move into Brazilian gold assets adds a precious-metals leg to a portfolio better known in our coverage for base metals and rare earth elements, signalling that diversified Chinese groups are willing to pay up for operating gold platforms in jurisdictions like Maranhão, Minas Gerais and Bahia rather than only greenfield critical-mineral plays.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Suncor Cat AHS at Mildred Lake and Komatsu Mud Mode: integration notes for mine planners
    Mining
    about 12 hours ago

    Suncor Cat AHS at Mildred Lake and Komatsu Mud Mode: integration notes for mine planners

    Suncor has commissioned its first Autonomous Operating Zone at Syncrude’s Mildred Lake oil sands mine, extending its autonomous haulage system deployment beyond the existing fleet of about 140 autonomous trucks already running at other Suncor sites. The new zone uses Cat AHS fleets under Suncor control (since late 2021) and is complemented by Komatsu AHS trucks at Base Plant operating with a dedicated “Mud Mode” to maintain traction and control in soft ground. For mine planners, this signals wider-scale AHS integration across multiple pits and variable ground conditions.

    Central Nevada Gold’s Mule Canyon acquisition: project and risk lens for engineers
    Mining
    1 day ago

    Central Nevada Gold’s Mule Canyon acquisition: project and risk lens for engineers

    Central Nevada Gold has completed a US$20 million acquisition of Newmont’s past‑producing Mule Canyon mine in Nevada, targeting a prefeasibility study and key permits in H2 2027 ahead of a potential 2028 construction decision. Mule Canyon previously produced about 500,000 oz gold at an average head grade of 3.8 g/t with ~94% metallurgical recovery, and comes with a database of 2,149 drill holes totalling over 335,000 metres across six mineralised zones over 2.5 km. The company plans an IPO as early as 2027 after a 20‑hole metallurgical and infill drilling programme to upgrade inferred resources and de‑risk the project.

    Greenland Mines’ Sarfartoq licence: key project and offtake notes for mine planners
    Mining
    1 day ago

    Greenland Mines’ Sarfartoq licence: key project and offtake notes for mine planners

    Greenland Mines has secured government approval under the Greenland Mineral Activities Act for the indirect transfer of the Sarfartoq carbonatite complex exploration licence, clearing a key condition in its US$35 million acquisition from Neo Performance Materials, which retains offtake rights to up to 60% of future ore or concentrate. The Nd-Pr-enriched project, about 60 km from Kangerlussuaq, carries a historic NI 43-101 resource with 5.88 Mt indicated at 1.77% TREO and 2.46 Mt inferred at 1.59% TREO, based on 23,000 m of drilling. The news sent Greenland Mines’ NASDAQ-listed shares up more than 22%, giving the company a market capitalisation of US$31.4 million.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental