Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    DHL–Metso Queensland warehousing: logistics and uptime insights for mine planners

    June 10, 2026|

    Reviewed by Tom Sullivan

    DHL–Metso Queensland warehousing: logistics and uptime insights for mine planners

    First reported on International Mining – News

    30 Second Briefing

    DHL Supply Chain Australia has been appointed strategic 3PL partner for Metso, taking over warehousing operations from Berrinba in Brisbane to handle inbound logistics, storage and outbound movement of heavy equipment and mineral processing machinery for Queensland mines. The Berrinba facility will act as a central hub for crushers, screens, mill components and wear parts, consolidating inventory closer to major coal and metals operations in the Bowen and Surat basins. Faster parts availability and streamlined freight routing should cut unplanned downtime risk and simplify maintenance planning for Metso’s mining customers.

    Technical Brief

    • DHL Supply Chain Australia is formally contracted as Metso’s strategic third‑party logistics (3PL) provider.
    • Contract explicitly spans inbound logistics, intermediate storage and outbound freight for mining equipment and machinery.
    • DHL’s role focuses on parts and assemblies “critical to Australia’s mining industry”, not general merchandise.
    • Queensland footprint expansion for Metso is being executed via outsourced logistics rather than in‑house warehousing.

    Our Take

    Locating Metso’s logistics in Berrinba, Brisbane, positions heavy spares and wear parts close to Queensland’s coal and critical minerals belt, which typically reduces shutdown risk for remote mines that depend on just‑in‑time deliveries.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    South32’s 61% Sierra Gorda reserve lift: life-of-mine and plant planning notes
    Mining
    about 10 hours ago

    South32’s 61% Sierra Gorda reserve lift: life-of-mine and plant planning notes

    South32 has lifted the Sierra Gorda ore reserve in Chile by 61% to 1.1 billion tonnes at 0.39% total copper, 0.016% molybdenum and 0.06 g/t gold (0.46% CuEq), extending reserve life by about five years to 2045 after 85,000 metres of infill drilling from 200 holes. The updated MRE now stands at 1.87 billion tonnes at 0.37% copper (0.44% CuEq), with the orebody remaining open at depth and additional potential at the Catabela Northeast target. A fourth grinding line, approved in July, is expected to lift copper output by roughly 30% from 2031, reinforcing long-term concentrator planning and infrastructure requirements.

    Agnico’s C$57M Radisson stake: O’Brien gold mine access and PEA lens for engineers
    Mining
    about 10 hours ago

    Agnico’s C$57M Radisson stake: O’Brien gold mine access and PEA lens for engineers

    Agnico Eagle Mines is investing C$57.2 million in Radisson Mining Resources for a 10.5%–14.9% stake to advance underground access and infrastructure at the historic O’Brien gold mine in Quebec’s Bousquet-Cadillac camp along the Larder Lake-Cadillac Break. Funding will support an access ramp, underground workings, surface facilities and water management, complementing Radisson’s fully funded 140,000-metre surface drilling and a planned 11-year underground operation with toll milling at IAMGOLD’s Doyon plant. A July 2025 PEA at US$3,300/oz gold pegs O’Brien’s after-tax NPV5 at C$871 million with a 74% IRR, underpinned by recent intercepts such as 5.1 m at 316.31 g/t from 823 m.

    Top of Mine: Costa’s AI-through-mining thesis and what it means for project teams
    Mining
    about 10 hours ago

    Top of Mine: Costa’s AI-through-mining thesis and what it means for project teams

    Otavio (Tavi) Costa, founder and CEO of Azuria Capital, argues that mining equities are currently the cheapest way to gain AI exposure, as sovereign funds and governments re-rate the sector and mid-tier producers move to secure “strategic reserves” by acquiring high-quality junior assets. He links this to a macro backdrop where global debt has returned to World War II levels but only about 3% of the US Treasury market is now backed by gold, versus roughly 50% then. With spot gold at $4,673.20/oz, Costa expects reserve depletion, weak discoveries and a “global monetary race towards gold” to drive prices substantially higher.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental