Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Citi’s 40% lithium price cut: project pipeline and capex signals for mine planners

    November 3, 2026|

    Reviewed by Joe Ashwell

    Citi’s 40% lithium price cut: project pipeline and capex signals for mine planners

    First reported on MINING.com

    30 Second Briefing

    Citigroup has cut its 2027 lithium carbonate and hydroxide price forecasts by around 40% to $12,000 per tonne (from $20,000 and $17,000) and slashed its spodumene outlook from $2,000 to $1,200, citing slower battery demand growth, lean inventories and trade uncertainty. Chinese lithium carbonate futures on the Guangzhou Futures Exchange have fallen over 40% since August, with additional downside risk from CATL’s Jianxiawo mine restarting after receiving environmental approval. Despite near-term surplus expectations, long-term projections still imply up to 134 new lithium mines and roughly $100 billion in investment to meet demand to 2050.

    Technical Brief

    • Guangzhou Futures Exchange’s most-active lithium carbonate contract traded at 91,160 yuan/t (~$13,710) on Monday.
    • That same futures contract has lost over 40% of its value since end-August 2026.
    • Chinese futures have been weakening for ten consecutive months, signalling sustained bearish sentiment in battery materials.
    • EU–China deal to cut hybrid car exports is feeding demand-risk premia into Chinese lithium pricing.
    • CATL’s Jianxiawo mine, shut since August, has now received local environmental approval to restart operations.
    • Rio Tinto’s two new lithium operations in Catamarca, Argentina, are ramping into this softer price environment.
    • Long-run demand projections to 2050 imply roughly 134 additional lithium mines and ~$100 billion new capex globally.

    Our Take

    Citigroup’s bearish lithium view contrasts with its bullish copper call in the 2 June 2026 piece, signalling a rotation in its house view towards copper- and uranium-linked miners and away from marginal lithium projects.

    Our database of 100 lithium- and lithium carbonate-tagged pieces shows that, despite Citi’s 40% forecast cut, long-run narratives still hinge on the 134 new lithium mines and $100 billion of investment cited here, implying project deferrals rather than outright cancellations in key regions like Catamarca and British Columbia.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Chile copper outlook worsens: supply, price and project signals for engineers
    Mining
    about 2 hours ago

    Chile copper outlook worsens: supply, price and project signals for engineers

    Chile’s state copper commission Cochilco has slashed 2026 mine output forecasts to 4.94 Mt from 5.27 Mt and cut 2027 guidance to 5.08 Mt, while lifting its 2027 price outlook 17% to $5.95/lb as Escondida, Spence and Codelco-driven grade decline, maintenance and interruptions deepen an 8.4% national production drop. Refined copper surpluses are now put at just 144,000 t in 2026 and 215,000 t in 2027 (0.5–0.8% of consumption), with Cochilco warning that a 1% demand surprise would flip 2027 into a 65,000 t deficit. Tightness is already visible in physical markets, with Yangshan premiums at $205/t, LME cash trading $210/t over three-month, and Shanghai Futures Exchange stocks down 18% to 44,612 t.

    $712bn mining sell-off since Iran war: key signals for project teams
    Mining
    about 2 hours ago

    $712bn mining sell-off since Iran war: key signals for project teams

    Global mining equities have shed $712 billion since February’s $2.75 trillion peak, with the MINING.COM TOP 50 now down 26% and October alone erasing $226 billion as higher US rate expectations, Middle East-driven oil gains and a tech-stock rout forced fund de-risking. Gold fell 6.6% in October to $3,884/oz and silver 18.2% to $49.39/oz, wiping $55 billion from 16 gold miners, while copper producers lost $69 billion despite copper holding near $6.47/lb and the World Bank lifting its 2027 forecast to $13,000/t. Trading volumes also thinned sharply, with only 12% of TOP 50 market value turning over in October versus 18–19% earlier in the year, signalling buyers stepping back rather than capitulation selling.

    Nouveau Monde Graphite lease milestone: design and ESG notes for mine planners
    Mining
    about 2 hours ago

    Nouveau Monde Graphite lease milestone: design and ESG notes for mine planners

    Nouveau Monde Graphite has secured Mining Lease No. 1057 from Quebec’s Ministry of Natural Resources and Forests for its Matawinie project, granting rights to mine the Metawinie graphite deposit about 120 km north of Montreal. The open-pit operation is planned to produce up to 106,000 tonnes of graphite concentrate per year, positioning it as the largest graphite mine in the G7, and follows a 2021 BAPE environmental and social impact authorisation plus an Impact Benefit Agreement with the Atikamekw First Nation of Manawan. Construction-phase measures include onsite water reuse, biodiversity protection and co-disposal of tailings and waste rock, although MiningWatch Canada has raised concerns over reported heavy metal concentrations in nearby waterways.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental