Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects

    Channel Tunnel tax hike: Eurotunnel investment halt and what it means for UK rail engineers

    November 21, 2025|

    Reviewed by Joe Ashwell

    Channel Tunnel tax hike: Eurotunnel investment halt and what it means for UK rail engineers

    First reported on New Civil Engineer

    30 Second Briefing

    Channel Tunnel owner Eurotunnel is cancelling all planned UK rail infrastructure investments after warning its business rates are set to almost triple from 2026, describing the increase as “unparalleled” for a single asset. The company, which operates the 50 km fixed link between Folkestone and Coquelles and handles both high-speed passenger and freight traffic, says the tax shock undermines the business case for new terminals, sidings and capacity upgrades. For UK rail engineers, this signals potential delays to cross-Channel capacity enhancements and associated track, signalling and terminal works on the British side.

    Technical Brief

    • For other single-asset infrastructure (e.g. major bridges, fixed links), similar rating shocks could stall enhancement schemes.

    Our Take

    Within the 20 recent Infrastructure stories in our coverage, the UK appears frequently in pieces about constrained public budgets, so Eurotunnel’s decision around the Channel Tunnel will likely harden perceptions of the UK as a higher-risk environment for long-horizon rail concessions.

    For UK-based rail and tunnelling contractors, cancelled Eurotunnel-linked work removes a rare source of privately driven, cross-border infrastructure spend, pushing them back towards more politically exposed domestic schemes such as HS2-related packages and regional upgrades.

    Operators of other strategic fixed links in Europe watching the Channel Tunnel tax situation may now treat UK-side investments as requiring higher hurdle rates or stronger contractual protections, which can slow or downsize future capacity or resilience projects on the British network.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Sydney Metro Stations Package West: design and delivery notes for engineers
    Infrastructure
    in 4 months

    Sydney Metro Stations Package West: design and delivery notes for engineers

    Gamuda Engineering has secured the Sydney Metro Stations Package West as principal contractor, covering design and construction of five new underground stations at Westmead, North Strathfield, Burwood North, Five Dock and The Bays on the 24km Sydney Metro West line between Greater Parramatta and the CBD. The scope includes deep station boxes, entrances and access points, full station fit-out and integration with surrounding precincts, with Laing O’Rourke and DT Infrastructure joining as MetroVista delivery partners. Site works are scheduled to start on Monday, 5 January 2026.

    Nottingham Forest City Ground expansion: design and crowd-flow notes for engineers
    Infrastructure
    about 9 hours ago

    Nottingham Forest City Ground expansion: design and crowd-flow notes for engineers

    Nottingham Forest has submitted new plans to expand the City Ground from 30,445 to about 52,000 seats, replacing last year’s approved but smaller 35,000-capacity scheme focused on rebuilding the Peter Taylor Stand. The revised project team is led by KSS Design Group, with Buro Happold, Gleeds and Savills advising, and owner Evangelos Marinakis committing “significant investment” for a “sustainable and iconic” redevelopment. For civil and structural engineers, the jump to a 52,000-seat bowl signals substantially larger crowd loading, egress, services and transport interface requirements on an already constrained riverside site.

    TH White joins Sany network: fleet support implications for UK plant owners
    Infrastructure
    about 10 hours ago

    TH White joins Sany network: fleet support implications for UK plant owners

    TH White has been appointed authorised Sany Heavy Machinery UK dealer for construction machinery sales, service and parts across the West Midlands and parts of the southwest, replacing Worcester-based forklift specialist MSM DRH after five years. The move plugs Sany’s excavators and other construction machines into TH White’s existing portfolio of Manitou, Mecalac and New Holland equipment plus Palfinger cranes, giving contractors a single supplier for mixed fleets. For plant owners, the key change is access to Sany support through TH White’s established construction-focused sales and service teams.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.