Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects

    BMO on Canada’s C$120bn mining pipeline: capex and project signals for engineers

    September 14, 2026|

    Reviewed by Joe Ashwell

    BMO on Canada’s C$120bn mining pipeline: capex and project signals for engineers

    First reported on MINING.com

    30 Second Briefing

    Canada is positioning for a larger share of global mining capital as BMO Global Metals & Mining flags C$120 billion in planned project spending in Natural Resources Canada’s 10‑year Major Projects Inventory and forecasts more than 11% annual growth in development capex over the next two years. BMO urges investors to shift from purely upstream projects towards domestic copper smelting and refining, battery precursor materials, rare earth separation and by‑product capture to build end‑to‑end supply chains. The bank also points to separating mine and infrastructure financing, tapping under‑allocated Canadian pension assets (C$4.5 trillion), and targeting new districts from BC to Ontario’s Ring of Fire and Nunavut.

    Technical Brief

    • Natural Resources Canada’s 10‑year Major Projects Inventory now totals C$120B, up C$50B from 2018.
    • Previous cycle peak investment reached ~C$220B (real 2026 dollars), underscoring current headroom for new projects.
    • BMO-covered miners are projected to spend C$350B on opex, sustaining capex and growth in Canada over five years.
    • Saskatchewan remains the world’s top potash investment destination, anchoring Canada’s leading potash production base.
    • Canada currently ranks second globally in uranium production and fourth in both gold output and aluminium refining.
    • New district development is flagged from British Columbia through Ontario’s Ring of Fire to Nunavut for gold, nickel, lithium.
    • Canadian pension funds manage C$4.5T in assets, identified as under‑allocated to domestic mining and infrastructure.
    • Separating mine and infrastructure financing is proposed to attract specialist infrastructure funds and lower project capital costs.

    Our Take

    The C$350 billion five‑year spend in Canada for copper, nickel, lithium and other critical minerals sits against a backdrop of US federal critical‑minerals support totalling about US$18.6 billion across 60 financings, suggesting cross‑border policy tailwinds for projects that can qualify on both sides of the border.

    Natural Resources Canada’s C$120 billion major‑projects pipeline to 2025, combined with Canada’s status as the top potash and second‑largest uranium producer, positions Saskatchewan assets in particular to benefit from the fertiliser and nuclear themes that recur across our 1276 Mining stories.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    US DOE $73M Mine of the Future funding: key testbed insights for engineers
    Mining
    2 days ago

    US DOE $73M Mine of the Future funding: key testbed insights for engineers

    The US Department of Energy has awarded US$73 million through its Mine of the Future initiative to four projects creating national-scale mining testbeds in West Virginia, Colorado, Arizona, Missouri and Texas. Innovative Wireless Technologies will integrate underground and surface sites in Julian, Blacksburg and Idaho Springs to validate next‑generation digital, connectivity and automation systems, while the University of Arizona and University of Missouri will build underground and comminution proving grounds focused on electrification and energy management. Southern Methodist University will repurpose a heavily instrumented Navasota drilling site into a “synthetic mine” for repeatable testing of drilling, sensing and autonomous workflows, aiming to de‑risk commercial deployment.

    Mining leads Canadian PM’s C$1T pitchbook: project finance signals for engineers
    Mining
    2 days ago

    Mining leads Canadian PM’s C$1T pitchbook: project finance signals for engineers

    Mining projects dominate Prime Minister Mark Carney’s leaked C$1 trillion, five‑year investment pitchbook, with 63 of 167 opportunities spanning lithium, nickel, graphite, rare earths, gold and copper, and including proposals such as Canada’s first uranium refining and conversion plant in more than 40 years. Confirmed entries range from LithiumBank’s Boardwalk lithium brine project in Alberta, with 5.2 million measured and indicated tonnes LCE at 81.6 mg/L, to Surge Copper’s Berg copper‑molybdenum project, scoped for a 28‑year life and 176 million lb copper per year. Despite a 75% year‑on‑year rise to C$10.1 billion in TSX/TSXV mining equity raisings, pension and sovereign funds remain cautious on finite‑life mines, making long‑life assets and midstream processing plants more likely to secure capital.

    Cyclic Materials’ Mesa rare earth recycling plant: process and scale notes for engineers
    Mining
    2 days ago

    Cyclic Materials’ Mesa rare earth recycling plant: process and scale notes for engineers

    Cyclic Materials has opened a 144,000-square-foot rare earth magnet recycling plant in Mesa, Arizona, designed to process up to 25,000 tonnes per year of magnet-bearing end-of-life products using its proprietary MagCycle mechanical separation technology. The feedstock-agnostic facility is already running at 8 tonnes per hour, producing Mag-Xtract rare earth magnet material and recovering copper, aluminium and steel for sale to US smelters, with over 7,000 tonnes of material already delivered. Backed by more than US$20 million in investment, the plant is intended as a replicable model ahead of a planned South Carolina rare earth recycling campus.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental