Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Ballard Mt Ida drilling: resource growth and design takeaways for mine planners

    November 18, 2026|

    Reviewed by Tom Sullivan

    Ballard Mt Ida drilling: resource growth and design takeaways for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Ballard Mining has reported “strong” extensional and resource-definition drilling results at its Mt Ida gold project in Western Australia, including a key intercept of 32m at 2.4g/t gold, and is targeting an updated mineral resource estimate in the first half of 2027. The current campaign is focused on step-out drilling to extend known lodes and infill drilling to tighten spacing for resource classification upgrades. For mine planning teams, the results suggest potential for increased ounces and improved confidence in pit and underground designs at Mt Ida.

    Technical Brief

    • Current work program combines extensional drilling on lode margins with resource-definition drilling on known shoots.
    • Drilling is targeting both open-pittable mineralisation near surface and deeper underground-style lodes along strike.
    • Step-out holes are testing continuity of high-grade structures beyond the existing modelled mineralisation envelopes.
    • Infill drilling aims to reduce sample spacing sufficiently for upgrading Inferred ounces to higher-confidence categories.

    Our Take

    Earlier coverage in October 2026 shows Mt Ida already at 1.84Moz at 2.8g/t, so these 32m at 2.4g/t intercepts are likely being used to convert and tighten that resource rather than simply chase new ounces.

    Targeting an updated mineral resource estimate in the first half of 2027 suggests Ballard Mining is pacing drilling and studies to align with a potential development decision window rather than short‑term market newsflow.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Epiroc SmartROC D65 at Vicuña copper: drilling automation lens for mine planners

    Two Epiroc SmartROC D65 surface drill rigs will be deployed at the Vicuña copper project in Argentina, a 50:50 BHP–Lundin Mining joint venture described by Epiroc Southern Cone General Manager Patricio Lagarini as one of the world’s major emerging copper developments. The SmartROC D65 platform is typically used for 110–229 mm production blastholes and pre-split drilling in large open pits, bringing automated drilling sequences and GPS-based hole navigation suited to high-altitude Andean conditions. For mine planners and drill‑and‑blast engineers, the move signals early adoption of fully programmable, data-rich drilling for future large-scale pit development.

    Ground View Pakistan: skills pipeline and mining shift explained for engineers
    Mining
    about 3 hours ago

    Ground View Pakistan: skills pipeline and mining shift explained for engineers

    Pakistan’s Quaid-i-Azam University Earth Sciences department reports record undergraduate intake in geology and geophysics even as master’s and PhD applications have halved in a decade, from over 70 to about 30 per semester, amid rising mineral exploration demand. Chair of department Dr Shazia Naseem says mineral work is now overtaking petroleum, with graduates split roughly 50:50 between oil and gas and mining roles at OGDC, Mari, Pakistan Oilfields and private explorers. Around 20–30% of graduates leave to work abroad, creating a skills drain just as projects such as Reko Diq and “untapped” Balochistan prospects need local expertise.

    Mining
    about 2 hours ago

    Multotec’s trommel screens: optimisation lessons for plant and process engineers

    Multotec argues that trommel screens remain undervalued in plant optimisation despite being central to size classification and stable downstream performance in milling and leaching circuits. The company points to incremental advances such as modular polyurethane or rubber panels, optimised open-area layouts, and improved scroll and lifter configurations that raise screening efficiency and reduce blinding and wear. For plant engineers, the message is that detailed trommel design and maintenance strategies can materially affect throughput, circulating loads, and liner life without major capital changes elsewhere in the circuit.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental