Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Aya’s bonanza silver hits at Zgounder mine: resource and pit design notes for engineers

    June 3, 2026|

    Reviewed by Joe Ashwell

    Aya’s bonanza silver hits at Zgounder mine: resource and pit design notes for engineers

    First reported on MINING.com

    30 Second Briefing

    New drilling at Aya Gold & Silver’s Zgounder mine in Morocco returned bonanza underground intercept T28-26-1248 with 8 m at 2,176 g/t Ag from 8 m, including 4 m at 4,298 g/t, plus open-pit hole ZG-RC-26-946 with 6 m at 1,867 g/t from 96 m. Additional RC holes in the pit area cut up to 10 m at 739 g/t Ag from 129 m and 6 m at 1,160 g/t from 6 m, from a 116‑hole campaign that is one‑third of a 30,000 m 2026 programme. Zgounder, a 1.4 Mt/y silver‑only operation with 15.7 Mt at 145 g/t Ag reserves (73.4 Moz) and life to 2036, is extending mineralisation at depth and along the Western Fault ahead of further drilling from the 1,825 m exploration drift in H2 2026.

    Technical Brief

    • Processing plant expansion completed in 2024 lifted Zgounder’s milling capacity to 1.4 Mt per year.
    • Proven and probable reserves stand at 15.7 Mt at 145 g/t Ag, totalling 73.4 Moz contained.
    • Zgounder lies ~215 km south of Marrakech by road, influencing logistics and reagent supply chains.
    • The 2026 exploration programme totals 30,000 m of drilling, with ~10,000 m already completed.
    • Recent drilling includes 116 holes, combining underground core and open-pit reverse circulation methods.
    • New mineralised zones have been delineated north of the current open pit footprint.
    • Mineralisation is being extended along the Western Fault corridor, with an exploration drift at 1,825 m level advancing.
    • Zgounder contributed about 41% of Aya Gold & Silver’s net asset value in Scotia Capital’s assessment.

    Our Take

    With Zgounder already contributing 41% of Aya Gold & Silver’s NAV and reserves of 73.4 million oz at 145 g/t, the bonanza-grade hits in the Western Fault corridor likely strengthen the case for further mine-life extensions beyond the current 2036 plan rather than relying solely on the Boumadine polymetallic project, whose feasibility is only targeted for late 2027.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Electra–WMC Ontario cobalt refinery deal: cashflow and offtake lens for engineers
    Mining
    about 9 hours ago

    Electra–WMC Ontario cobalt refinery deal: cashflow and offtake lens for engineers

    Electra Battery Materials has signed a five-year working-capital and commercial partnership term sheet with Swiss commodities trader WMC Group AG to finance cobalt feedstock purchases and market battery-grade cobalt sulfate from its Temiskaming Shores refinery in northern Ontario. The deal covers logistics management, inventory working capital and exclusive marketing of output up to the plant’s nameplate capacity as Electra restarts North America’s only cobalt sulfate refinery, backed by US and Canadian government funding. The structure is aimed at smoothing the operating cash cycle as the project moves from construction and commissioning into production.

    SSR–Roxmore $464M deal: Nevada gold mine capex and NPV lens for planners
    Mining
    about 9 hours ago

    SSR–Roxmore $464M deal: Nevada gold mine capex and NPV lens for planners

    SSR Mining will acquire Nevada-focused Roxmore Resources for C$660.1 million in cash, securing the Converse open-pit project 6 km west of its Marigold mine, where a PEA outlines 250,000 oz. per year over 15 years, with a post-tax NPV of $2.7 billion at $3,600/oz. gold and a 42.8% IRR. Converse, hosting 103 million indicated tonnes at 0.65 g/t and 218 million inferred tonnes at 0.43 g/t, could lift SSR’s US output to 350,000–400,000 oz. annually from 2033–2042, despite an $829 million initial capex. In parallel, an updated Marigold plan extends mine life to 20 years, boosts probable reserves 43% to 4.6 million oz., and more than triples post-tax NPV to $3.3 billion, with life-of-mine capex rising to $1.3 billion and Buffalo Valley (700,000 oz. reserves) feeding first ore from 2029.

    The Ore Wars 2002–2026: iron ore price cycles mapped for mine planners
    Mining
    about 9 hours ago

    The Ore Wars 2002–2026: iron ore price cycles mapped for mine planners

    Iron ore’s journey from a $13/t, annually negotiated benchmark in 2002 to a daily traded futures market peaking at $237.57/t in May 2021 is mapped in MINING.COM’s “Ore Wars” interactive, tracking 49 key inflection points. The timeline covers BHP’s failed $140 billion bid for Rio Tinto, the collapse to $37/t in December 2015, the Samarco and Brumadinho tailings disasters, and China’s push for yuan‑denominated pricing. For mine planners and marketers, it neatly links price shocks to supply surges, port stockpiles, freight rates and single‑buyer risk.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental