Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects

    Aurelia’s Great Cobar–Peak expansion: integrated flowsheet notes for mine planners

    August 27, 2026|

    Reviewed by Joe Ashwell

    Aurelia’s Great Cobar–Peak expansion: integrated flowsheet notes for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Aurelia Metals is advancing the high-grade Great Cobar copper–gold project in the Cobar Basin while expanding its Peak processing plant to lift throughput capacity by up to 50 per cent. Great Cobar is targeting first production in the 2027–28 financial year, feeding copper–gold ore into the upgraded Peak concentrator rather than building a standalone plant. The integrated flowsheet and higher milling rate will be central to mine planning, tailings storage design and long-term utilisation of existing underground infrastructure at Peak.

    Technical Brief

    • Tailings storage planning must accommodate higher combined tonnage and potentially different Great Cobar ore geochemistry.
    • Mine scheduling at Great Cobar will be constrained by Peak’s upgraded milling rate and campaign blending requirements.

    Our Take

    Aurelia Metals’ recent outperformance in FY26 gold and copper production in our database suggests the 50 per cent lift in Peak processing plant capacity at Great Cobar is being timed off a stronger cash-flow base, which can de-risk execution through FY28.

    The earn-in over additional Cobar Basin ground with Legacy Minerals, noted in our June 2026 coverage, indicates Aurelia is positioning Great Cobar and the Peak plant as a regional hub rather than a single-asset circuit, which can improve unit costs and exploration optionality around the plant.

    With Steve Badenhorst (ex-Rio Tinto) due to take over as MD/CEO in late 2026, governance of the Great Cobar copper-gold build-out in Australia will likely reflect a more major-miner style project discipline, which is relevant as copper-gold projects dominate a large share of our 604 keyword-matched pieces.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Boliden’s controlling stake in Nexa Resources: portfolio and capex lens for mine planners

    Boliden AB will acquire all of Votorantim SA’s shares in Nexa Resources SA, taking a 64.68% controlling stake while Votorantim retains about 7%, consolidating ownership of Nexa’s zinc and polymetallic operations in Brazil and Peru. The deal gives Boliden strategic control over Nexa’s integrated mining–smelting chain, including large-scale assets such as the Cerro Lindo and Vazante mines and Três Marias smelter. Engineers should watch for potential changes in capital allocation, mine life extension strategies and brownfield expansion across Nexa’s Latin American portfolio.

    Mining
    about 2 hours ago

    IMARC 2026 Innovation & Investment Alley: key takeaways for mine project teams

    IMARC will return its Innovation & Investment Alley in 2026, with Editorial Director Richard Roberts saying the event will again assemble one of the sector’s strongest line-ups of mining technology leaders and early‑stage innovators. More than 500 solution providers are expected in Melbourne, giving mine operators, contractors and investors concentrated access to digital mining platforms, automation vendors and equipment OEMs in a single venue. For engineers, the alley offers a dense snapshot of deployable technologies and pilot‑ready concepts that could feed directly into 2027–2030 project pipelines.

    Mining
    about 2 hours ago

    Metso Simberi expansion package: flowsheet and risk notes for gold plant engineers

    Metso has secured multiple process technology packages for the New Simberi Gold Project Expansion in Papua New Guinea, supplying grinding, flotation, thickening and filtration equipment. The project is owned by Simberi Gold Company Limited, a 50:50 joint venture between Lingbao Gold Group and St Barbara Limited, with engineering delivery led by Pitch Black Group. The deal signals further standardisation of Metso’s integrated comminution–flotation–tailings dewatering flowsheets on brownfield gold expansions in the Asia–Pacific region.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental