Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Aura Minerals reserve surge to 7.22Moz GEOs: project and pit notes for engineers

    April 1, 2026|

    Reviewed by Tom Sullivan

    Aura Minerals reserve surge to 7.22Moz GEOs: project and pit notes for engineers

    First reported on MINING.com

    30 Second Briefing

    Aura Minerals has more than doubled its proven and probable reserves to 7.22 million gold-equivalent ounces (GEOs) from 3.44 million, spanning six operating mines and two development projects across the Americas. Key drivers include a 170% reserve increase at the Borborema mine in Brazil following pit expansion, updated geological models and higher gold price assumptions in a new feasibility study, plus added underground reserves at Almas and the June acquisition of the Mineração Serra Grande mine from AngloGold Ashanti. Aura drilled over 106,500 metres in 2025 on US$21.8 million of exploration spend and is targeting 600,000 GEOs/year versus 280,000 GEOs produced in 2025.

    Technical Brief

    • Exploration intensity reached over 106,500 m drilled in 2025 for US$21.8 million spend.
    • Measured and indicated resources rose 26% to 3.49 million GEOs across the portfolio.
    • Inferred resources expanded by more than 200% to approximately 3.92 million GEOs.
    • Aura now operates six producing mines plus two development assets distributed across the Americas.
    • Market capitalisation reached US$7.33 billion, with NASDAQ shares nearing the US$90.19 all‑time high.
    • Rapid reserve and resource growth at a relatively modest exploration budget suggests low discovery cost per GEO.

    Our Take

    In our database of 1208 Mining stories, relatively few gold-focused companies outside the majors report exploration budgets above US$20 million in a single year, so Aura’s US$21.8 million 2025 spend and resulting >200% inferred resource growth position it at the aggressive end of the Latin American mid-tier explorer-producer spectrum.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Northern Star March gold surge: ramp-up implications for mine planners and contractors
    Mining
    about 4 hours ago

    Northern Star March gold surge: ramp-up implications for mine planners and contractors

    Northern Star Resources’ March quarter gold sales have surged, signalling a production ramp-up across its Western Australian assets including Kalgoorlie Consolidated Gold Mines and the Super Pit. Management is positioning for record output in FY25–26 as processing throughput and mine development advance at key hubs such as Yandal and Pogo, supported by higher mill utilisation and improved grade control. For contractors and suppliers, the trajectory points to increased demand for underground development, open-pit fleet capacity, and plant optimisation services over the next 12–18 months.

    Ausenco EPCM at Hillside copper project: design and risk notes for engineers
    Mining
    about 4 hours ago

    Ausenco EPCM at Hillside copper project: design and risk notes for engineers

    Ausenco has secured an engineering, procurement and construction management (EPCM) contract for the Hillside copper project, signalling progression towards full project execution after a prolonged permitting and feasibility phase. The mandate covers process plant design, materials handling and associated infrastructure, positioning Ausenco to define key specifications for concentrator throughput, tailings management and power supply. For geotechnical and civil teams, the EPCM scope will drive final decisions on pit geotechnics, foundation systems for heavy plant and haul road geometry ahead of construction mobilisation.

    ION Minerals lithium brine expansion: resource scale and project lens for engineers
    Mining
    about 5 hours ago

    ION Minerals lithium brine expansion: resource scale and project lens for engineers

    ION Minerals has expanded its lithium brine portfolio to just over 280,000 mineral acres across the Smackover Formation in East Texas/Arkansas, the Texas Panhandle and Saskatchewan’s Duperow Formation, with adjacent Smackover projects reporting 47–60 tonnes LCE per acre. The company now controls nearly 50,000 acres between Tetra Technologies’ Evergreen Brine Unit and Standard Lithium’s Reynolds and Franklin units, plus 65,000 acres in the Texas Panhandle where internal work suggests up to 2.4 million tonnes LCE in place. A further 165,000 acres in southeast Saskatchewan could host up to 2.5 million tonnes LCE, with multi-bench Duperow drilling and testing scheduled for summer 2026.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy