Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Aura Minerals reserve surge to 7.22Moz GEOs: project and pit notes for engineers

    April 2, 2026|

    Reviewed by Tom Sullivan

    Aura Minerals reserve surge to 7.22Moz GEOs: project and pit notes for engineers

    First reported on MINING.com

    30 Second Briefing

    Aura Minerals has more than doubled its proven and probable reserves to 7.22 million gold-equivalent ounces (GEOs) from 3.44 million, spanning six operating mines and two development projects across the Americas. Key drivers include a 170% reserve increase at the Borborema mine in Brazil following pit expansion, updated geological models and higher gold price assumptions in a new feasibility study, plus added underground reserves at Almas and the June acquisition of the Mineração Serra Grande mine from AngloGold Ashanti. Aura drilled over 106,500 metres in 2025 on US$21.8 million of exploration spend and is targeting 600,000 GEOs/year versus 280,000 GEOs produced in 2025.

    Technical Brief

    • Exploration intensity reached over 106,500 m drilled in 2025 for US$21.8 million spend.
    • Measured and indicated resources rose 26% to 3.49 million GEOs across the portfolio.
    • Inferred resources expanded by more than 200% to approximately 3.92 million GEOs.
    • Aura now operates six producing mines plus two development assets distributed across the Americas.
    • Market capitalisation reached US$7.33 billion, with NASDAQ shares nearing the US$90.19 all‑time high.
    • Rapid reserve and resource growth at a relatively modest exploration budget suggests low discovery cost per GEO.

    Our Take

    In our database of 1208 Mining stories, relatively few gold-focused companies outside the majors report exploration budgets above US$20 million in a single year, so Aura’s US$21.8 million 2025 spend and resulting >200% inferred resource growth position it at the aggressive end of the Latin American mid-tier explorer-producer spectrum.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 5 hours ago

    Boliden’s controlling stake in Nexa Resources: portfolio and capex lens for mine planners

    Boliden AB will acquire all of Votorantim SA’s shares in Nexa Resources SA, taking a 64.68% controlling stake while Votorantim retains about 7%, consolidating ownership of Nexa’s zinc and polymetallic operations in Brazil and Peru. The deal gives Boliden strategic control over Nexa’s integrated mining–smelting chain, including large-scale assets such as the Cerro Lindo and Vazante mines and Três Marias smelter. Engineers should watch for potential changes in capital allocation, mine life extension strategies and brownfield expansion across Nexa’s Latin American portfolio.

    Mining
    about 5 hours ago

    IMARC 2026 Innovation & Investment Alley: key takeaways for mine project teams

    IMARC will return its Innovation & Investment Alley in 2026, with Editorial Director Richard Roberts saying the event will again assemble one of the sector’s strongest line-ups of mining technology leaders and early‑stage innovators. More than 500 solution providers are expected in Melbourne, giving mine operators, contractors and investors concentrated access to digital mining platforms, automation vendors and equipment OEMs in a single venue. For engineers, the alley offers a dense snapshot of deployable technologies and pilot‑ready concepts that could feed directly into 2027–2030 project pipelines.

    Mining
    about 5 hours ago

    Metso Simberi expansion package: flowsheet and risk notes for gold plant engineers

    Metso has secured multiple process technology packages for the New Simberi Gold Project Expansion in Papua New Guinea, supplying grinding, flotation, thickening and filtration equipment. The project is owned by Simberi Gold Company Limited, a 50:50 joint venture between Lingbao Gold Group and St Barbara Limited, with engineering delivery led by Pitch Black Group. The deal signals further standardisation of Metso’s integrated comminution–flotation–tailings dewatering flowsheets on brownfield gold expansions in the Asia–Pacific region.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental