Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2025 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Op-Ed

    Sydney Lenssen (1938–2025): legacy and lessons for civil engineering communicators

    December 11, 2025|

    Reviewed by Tom Sullivan

    Sydney Lenssen (1938–2025): legacy and lessons for civil engineering communicators

    First reported on New Civil Engineer

    30 Second Briefing

    New Civil Engineer founder and first editor Sydney Lenssen, born in 1938, has died in 2025, leaving a legacy in shaping modern civil engineering journalism in the UK. Lenssen was recalled from Australia in the summer of 1973 by the UK Government to help manage public communication during a period of national concern, underlining the strategic value placed on clear technical reporting. His editorial approach helped professionalise coverage of infrastructure, influencing how engineers, policymakers and the public engage with complex projects.

    Technical Brief

    • Lenssen’s editorial model prioritised project data, design rationale and construction methods over general-interest narratives.
    • He built structured reporting formats for cost, programme, procurement route and contractor/consultant roles on projects.
    • His approach normalised publishing cross-sections, construction sequences and geotechnical logs within mainstream trade journalism.
    • The template he set for infrastructure reporting is now mirrored in numerous sector titles and institutional publications.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Coventry Airport £2.5bn gigafactory: enabling works lens for civil engineers
    Infrastructure
    2 days ago

    Coventry Airport £2.5bn gigafactory: enabling works lens for civil engineers

    Plans to convert Coventry Airport into a £2.5bn battery gigafactory have moved a step forward after Warwick District Council’s planning committee approved applications covering early enabling works. The scheme, promoted as the UK’s largest battery manufacturing facility, will require full redevelopment of the existing airfield, major groundworks and new utilities to service large-scale process buildings and logistics areas. Civil and geotechnical teams can now progress detailed design for earthworks, foundations and site infrastructure ahead of main construction approvals.

    M62 Ouse Bridge joint replacement: fatigue and detailing lessons for engineers
    Infrastructure
    2 days ago

    M62 Ouse Bridge joint replacement: fatigue and detailing lessons for engineers

    Contractors will return to the M62 Ouse Bridge over the River Ouse this weekend (13–14 December) to replace a damaged expansion joint installed only a couple of years ago, following an unexpected bolt failure earlier this year. National Highways plans to complete the joint replacement under a short-duration closure to minimise disruption on this key trans-Pennine route between junctions 36 and 37. The repeat intervention on a relatively new joint raises questions over detailing, fatigue performance and inspection regimes for heavily trafficked motorway bridges.

    GE Vernova Hitachi BWRX‑300 GDA: design and civil works notes for engineers
    Infrastructure
    2 days ago

    GE Vernova Hitachi BWRX‑300 GDA: design and civil works notes for engineers

    UK regulators have advanced the GE Vernova Hitachi BWRX‑300 small modular reactor through the Generic Design Assessment in record time, signalling strong early confidence in the 300MWe boiling water design. The BWRX‑300 uses a simplified, natural‑circulation reactor concept derived from the ESBWR, with modular construction intended to reduce on‑site civil works, shorten programme durations and standardise below‑grade nuclear island layouts. Rapid GDA progress is likely to accelerate site‑specific geotechnical investigations, deep excavation design and nuclear‑grade concrete specification for potential UK deployments.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.