Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2025 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Product

    Victory Metals’ North Stanmore leach gains: process efficiency notes for engineers

    December 1, 2025|

    Reviewed by Tom Sullivan

    Victory Metals’ North Stanmore leach gains: process efficiency notes for engineers

    First reported on Australian Mining

    30 Second Briefing

    Victory Metals has reported “breakthrough” metallurgical performance at its North Stanmore rare earths project in Western Australia after kinetic leach testing significantly improved mineral processing efficiency. The company is targeting higher recoveries from clay-hosted rare earth mineralisation using kinetic leaching to shorten leach times and reduce reagent consumption compared with conventional static leach approaches. For process engineers, the results point to potential reductions in plant footprint and operating costs if the kinetic leach parameters can be scaled from testwork to full-scale hydrometallurgical circuits.

    Technical Brief

    • Kinetic leach testwork was conducted on clay-hosted rare earth mineralisation from North Stanmore in Western Australia.

    Our Take

    North Stanmore in WA drops into a very crowded part of our Projects-tagged coverage, where many Australian items focus on squeezing more throughput or recovery from existing flowsheets rather than greenfield scale-ups, so any genuine efficiency gain here is likely to be benchmarked closely by nearby operators.

    Within the 242 tag-matched pieces, WA projects that report step-changes in processing efficiency often use those results to fast-track feasibility updates or re-cut mine plans, suggesting Victory Metals could leverage this ‘breakthrough’ to reframe North Stanmore’s development sequence or cut pre-production capital intensity.

    For Australian projects in our database, demonstrable processing efficiency at the project stage has frequently been used to support offtake or equipment-supply negotiations, so North Stanmore’s performance claims may strengthen Victory Metals’ hand with OEMs and potential financiers even before full-scale development decisions are made.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Equinox sells Brazilian operations to CMOC: portfolio and capex shift for mine planners
    Mining
    about 8 hours ago

    Equinox sells Brazilian operations to CMOC: portfolio and capex shift for mine planners

    Equinox Gold has agreed to sell its entire Brazilian portfolio — the Aurizona and RDM mines plus the Bahia complex (Fazenda and Santa Luz) — to China’s CMOC Group for over US$1 billion, including US$900 million cash on closing and up to US$115 million in contingent payments tied to production. The divested assets were guided to produce 250,000–270,000 oz. of gold in 2025, while Equinox’s refocused portfolio will centre on the Greenstone (220,000–260,000 oz.), Valentine (175,000–200,000 oz. at full run-rate) and Mesquite (85,000–95,000 oz.) operations. Proceeds will be used to retire US$800 million of debt, cutting interest costs and freeing capital for expansions at Valentine, Castle Mountain and Los Filos, with group output targeted at 700,000–800,000 oz. next year.

    Silicon Ridge critical minerals in Utah: grade, flowsheet and capex notes for engineers
    Mining
    about 13 hours ago

    Silicon Ridge critical minerals in Utah: grade, flowsheet and capex notes for engineers

    Ionic Mineral Technologies reports its Silicon Ridge project in Utah is a halloysite-hosted ion-adsorption clay system grading about 2,700 ppm (0.27%) combined rare earths and critical metals from 106 boreholes over 10,000 m and 35 trenches across 650 acres, exceeding typical Chinese IAC grades of 500–2,000 ppm. The confirmed mineralisation currently covers only 11% of the resource area to 100 ft depth, with existing mining permits and a 74,000 ft² Provo processing plant enabling rapid start-up. Ionic MT plans a vertically integrated flowsheet producing three co-product streams—critical minerals (including gallium, germanium, scandium, lithium and tungsten), high-purity alumina and nano-silicon—with a preliminary economic assessment due in H1 2026.

    Metso Geminex™ digital twins: control and reliability insights for plant engineers
    Mining
    1 day ago

    Metso Geminex™ digital twins: control and reliability insights for plant engineers

    Metso is promoting its Geminex™ digital twin platform as a way to move mineral processing plant control beyond traditional DCS screens towards predictive and proactive maintenance. Geminex™ integrates real-time sensor data with dynamic process models of grinding, flotation and filtration circuits to simulate plant behaviour, test “what‑if” scenarios and optimise setpoints before implementation. For operators, this signals deeper use of virtual commissioning, remote performance tuning and model-based failure prediction across comminution and concentrator lines.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.