Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Simplified.

© 2025 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Metso–Miilux Häggblom divestment: lifecycle cost notes for mine fleets

    December 11, 2025|

    Reviewed by Tom Sullivan

    First reported on International Mining – News

    30 Second Briefing

    Metso has agreed to divest its Häggblom-branded loading and hauling business in Finland and Sweden to Miilux Oy, a Finnish manufacturer of wear-resistant steels and personal protection solutions using its own proprietary brands and alloys. The deal, which follows a strategic review launched in August 2025, shifts Häggblom’s truck body and bucket operations to an owner focused on abrasion-resistant plate and liner systems. For mine operators, the move signals closer integration between mobile equipment attachments and high-hardness wear materials, potentially affecting lifecycle cost and maintenance strategies for truck fleets and loaders.

    Technical Brief

    • Agreement covers Häggblom legal entities operating in both Finland and Sweden.
    • Transaction follows Metso’s formal strategic assessment process initiated in August 2025.

    Our Take

    In our database, Metso’s concurrent moves to open a bulk material handling hub in Pittsburgh and to supply pellet and comminution plants signal a pivot towards higher-margin process and systems work rather than owning peripheral loading/hauling product lines.

    For Nordic suppliers in Finland and Sweden, divesting non-core businesses to specialist firms like Miilux Oy typically frees engineering capacity for digitalised, high-throughput solutions such as Metso’s new Grande Series screens, which are prominent in recent coverage.

    Within the 260 Mining stories tracked, Metso appears frequently on greenfield and brownfield plant packages, so shedding a discrete loading and hauling unit is likely to simplify bid structures and aftermarket support for large projects where Metso already supplies crushing, screening and pelletising flowsheets.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Brightstar’s Menzies gold update: open pit and hub design notes for mine planners
    Mining
    44 minutes ago

    Brightstar’s Menzies gold update: open pit and hub design notes for mine planners

    Brightstar Resources has released a 22 per cent increase in mineral resource estimate for its Menzies gold project, sharpening plans to develop the site as a standalone mining hub in Western Australia’s Eastern Goldfields. The updated resource focuses on near-surface, open-pittable ounces across key deposits such as Yunndaga and Lady Shenton, supporting a potential central processing facility rather than trucking ore to Brightstar’s Laverton plant. For mine planners and geotechs, the shift towards shallow oxide and transitional material points to conventional drill‑and‑blast with relatively straightforward pit geotechnical design.

    Isaac Resources Excellence Precinct: design and testbed insights for mine engineers
    Mining
    about 1 hour ago

    Isaac Resources Excellence Precinct: design and testbed insights for mine engineers

    Final designs have been approved for the Isaac Resources Excellence Precinct in Moranbah, a $47 million hub to support coal, critical minerals and METS innovation in Queensland’s Bowen Basin. The precinct, led by the Resource Centre of Excellence and Isaac Regional Council, will include a 3000m² innovation centre, underground mining simulation facilities and training workshops targeting automation, decarbonisation and mine rehabilitation technologies. For engineers and METS suppliers, the project signals new testbed capacity close to large open-cut and underground coal operations.

    Great Fingall mines again: geotechnical and safety notes for WA gold engineers
    Mining
    about 1 hour ago

    Great Fingall mines again: geotechnical and safety notes for WA gold engineers

    Westgold Resources has restarted mining at the historic Great Fingall gold mine near Cue in Western Australia, firing the first production blast after more than a decade on care and maintenance. The operation targets high-grade underground ore beneath the old Great Fingall open pit, using modern longhole stoping and paste fill to extract remnant pillars and deeper lodes. Geotechnical teams will need to reconcile historic workings, old shaft infrastructure and voids with contemporary ground support, seismic monitoring and water management standards in WA’s Murchison region.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.