Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Simplified.

© 2025 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Greatland’s Havieron feasibility: design and haulage insights for mine planners

    December 1, 2025|

    Reviewed by Joe Ashwell

    Greatland’s Havieron feasibility: design and haulage insights for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Greatland Resources has released a feasibility study for the Havieron gold–copper project in Western Australia’s Paterson Province, confirming a long-life underground operation using bulk stoping beneath the existing Telfer processing hub. The study details a decline-access mine targeting high-grade breccia and sulphide mineralisation, with ore to be trucked to Telfer for treatment through existing crushing, grinding and flotation circuits. For geotechnical and mine planners, the integration with Telfer infrastructure reduces surface footprint and shifts design focus to deep underground stability, paste backfill and haulage optimisation.

    Technical Brief

    • Contracting strategy is expected to favour established Western Australian underground mining contractors familiar with Paterson conditions.
    • Integration of a new underground mine with an ageing processing hub mirrors other WA hub-and-spoke gold developments.

    Our Take

    Gold–copper combinations like Havieron are relatively prominent in our database of 57 keyword-matched pieces, signalling that Western Australian assets with both commodities are being positioned as hedge plays against single-commodity price cycles.

    Within the 253 tag-matched ‘Projects’ and ‘Contract Award’ items, Western Australia repeatedly appears as the jurisdiction where feasibility-stage work most often proceeds to early works or contracting, suggesting Havieron’s location may ease the transition from study to execution compared with less mature regulatory regions.

    Greatland Resources’ move at Havieron fits a pattern in our recent Mining coverage where smaller or mid-tier operators in Australia advance high-grade gold projects with copper by-product, which typically improves project financing options and may attract interest from larger producers seeking replacement ounces in WA.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Perpetua–Idaho National Lab antimony plant: design and supply‑chain notes for miners
    Mining
    about 1 hour ago

    Perpetua–Idaho National Lab antimony plant: design and supply‑chain notes for miners

    Perpetua Resources has partnered with Idaho National Laboratory, under Battelle Energy Alliance, to host, commission and operate a flexible, modular pilot plant to process Stibnite project ore into military‑specification antimony trisulphide concentrate for munitions and advanced defence systems. The pilot forms part of a US Army Defence Ordnance Technology Consortium agreement, with Perpetua now holding up to US$22.4 million in DOTC funding to advance domestic critical mineral processing. It runs alongside early works on the US$1.3 billion Stibnite gold‑antimony mine in central Idaho, aimed at a fully domestic “ground‑to‑round” supply chain.

    Copper price rally resumes: project pipeline and capex signals for mine planners
    Mining
    about 3 hours ago

    Copper price rally resumes: project pipeline and capex signals for mine planners

    Copper prices rebounded to $11,556.50/t on the LME, close to this week’s record $11,771/t, as RBC Capital Markets warned that mine disruptions and weak project pipelines mean higher prices are needed to unlock new supply. Analysts link the tight outlook to AI-driven data centre build-out, EV expansion and expectations of a US copper tariff, all adding to structural demand. The move follows a brief 1.3% pullback after Chinese data showed producer prices falling for a 38th consecutive month ahead of a key US rate decision.

    Mendoza’s $559m PSJ Cobre Mendocino copper mine: capex, schedule and design notes
    Mining
    about 7 hours ago

    Mendoza’s $559m PSJ Cobre Mendocino copper mine: capex, schedule and design notes

    Argentina’s Mendoza province has approved the PSJ Cobre Mendocino project, a $559 million joint venture between Zonda Metals and Alberdi Energy, marking its first large-scale mine in over 20 years after Senate endorsement of the environmental impact statement. The Uspallata operation is planned for 40,000 tonnes per year of copper concentrate over a 16-year mine life, using conventional flotation, with construction scheduled for 18–24 months and an estimated 3,900 construction and 2,400 operating jobs. The project now moves into detailed engineering, feasibility, cost and financing analysis before a construction decision.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.