Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Greatland’s Havieron feasibility: design and haulage insights for mine planners

    December 2, 2025|

    Reviewed by Joe Ashwell

    Greatland’s Havieron feasibility: design and haulage insights for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Greatland Resources has released a feasibility study for the Havieron gold–copper project in Western Australia’s Paterson Province, confirming a long-life underground operation using bulk stoping beneath the existing Telfer processing hub. The study details a decline-access mine targeting high-grade breccia and sulphide mineralisation, with ore to be trucked to Telfer for treatment through existing crushing, grinding and flotation circuits. For geotechnical and mine planners, the integration with Telfer infrastructure reduces surface footprint and shifts design focus to deep underground stability, paste backfill and haulage optimisation.

    Technical Brief

    • Contracting strategy is expected to favour established Western Australian underground mining contractors familiar with Paterson conditions.
    • Integration of a new underground mine with an ageing processing hub mirrors other WA hub-and-spoke gold developments.

    Our Take

    Gold–copper combinations like Havieron are relatively prominent in our database of 57 keyword-matched pieces, signalling that Western Australian assets with both commodities are being positioned as hedge plays against single-commodity price cycles.

    Within the 253 tag-matched ‘Projects’ and ‘Contract Award’ items, Western Australia repeatedly appears as the jurisdiction where feasibility-stage work most often proceeds to early works or contracting, suggesting Havieron’s location may ease the transition from study to execution compared with less mature regulatory regions.

    Greatland Resources’ move at Havieron fits a pattern in our recent Mining coverage where smaller or mid-tier operators in Australia advance high-grade gold projects with copper by-product, which typically improves project financing options and may attract interest from larger producers seeking replacement ounces in WA.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 11 hours ago

    Cementation Africa early dewatering designs: key lessons for mine planners

    Cementation Africa is pushing for underground mine dewatering to be designed from the earliest study phases, with hydrogeological investigations embedded in scoping and pre-feasibility work rather than added after shaft sinking. Study Manager Mine Engineering John Goulding stresses that early characterisation of aquifers, inflow rates and pore pressures allows proper sizing and siting of pump stations, sumps and grout curtains, and integration with shaft and decline layouts. For geotechnical and mine planners, this approach reduces unplanned inflows, avoids costly retrofits and supports more reliable ground support and excavation sequencing.

    Mining
    about 11 hours ago

    JordProxa at Lilac’s Great Salt Lake DLE plant: process design notes for engineers

    JordProxa has been selected as technology and equipment partner for Lilac Solutions’ Phase 1 commercial lithium carbonate plant on Utah’s Great Salt Lake, which targets 5,000 t/y of battery-grade lithium carbonate using direct lithium extraction. The partnership covers the downstream conversion process, integrating JordProxa’s thermal and process equipment with Lilac’s ion-exchange DLE system. First lithium production is planned for 2028, signalling a move from pilot-scale brine processing to a full commercial facility in a chemically complex salt-lake environment.

    Mining
    about 11 hours ago

    Orica Digital Solutions’ Axis Mining support in North Bay: reliability gains for drill teams

    Orica Digital Solutions has opened an Axis Mining Technology Technical Support & Service Centre in North Bay, Ontario, extending on-the-ground backing for its orebody intelligence systems to Canadian and wider North American mines. The facility will support deployment and maintenance of Axis downhole navigation and drillhole survey tools, improving turnaround for calibration, repairs and firmware updates that previously relied on distant service hubs. For geologists and drill and blast teams, closer support should reduce downtime on production and definition drilling and enable more consistent high-precision orebody data.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy