Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability

    AVESS WA vanadium battery EOI: project economics and grid storage lens for miners

    December 3, 2025|

    Reviewed by Tom Sullivan

    AVESS WA vanadium battery EOI: project economics and grid storage lens for miners

    First reported on Australian Mining

    30 Second Briefing

    AVESS Energy has lodged a stage one expression of interest for the Western Australian Government’s “breakthrough” vanadium battery project, targeting deployment of vanadium redox flow batteries to support long-duration grid storage. The proposal centres on using locally sourced vanadium from WA deposits to manufacture electrolyte and integrate containerised battery systems with existing transmission infrastructure. For miners and project developers, the move signals growing state-level backing for downstream vanadium processing and could influence future feasibility assumptions for WA vanadium ore bodies and associated infrastructure.

    Technical Brief

    • Containerised VRFB units imply modular deployment, affecting pad design, cranage requirements and transport envelope constraints.

    Our Take

    Vanadium appears in only a handful of keyword-matched pieces in our database, so AVESS Energy’s Western Australian initiative sits in a relatively niche segment compared with the dominant lithium and gold coverage in Mining projects.

    Being at a stage one expression of interest in Western Australia positions AVESS Energy to tap into a state approvals and funding environment that has recently been more receptive to long-duration storage and ‘critical minerals’ than to greenfield bulk commodities.

    For vanadium in Australia, most recent attention has centred on upstream mining proposals; a battery-focused project at the EOI stage signals a move further down the value chain towards local deployment of vanadium redox flow systems rather than just raw material export.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 10 hours ago

    Cementation Africa early dewatering designs: key lessons for mine planners

    Cementation Africa is pushing for underground mine dewatering to be designed from the earliest study phases, with hydrogeological investigations embedded in scoping and pre-feasibility work rather than added after shaft sinking. Study Manager Mine Engineering John Goulding stresses that early characterisation of aquifers, inflow rates and pore pressures allows proper sizing and siting of pump stations, sumps and grout curtains, and integration with shaft and decline layouts. For geotechnical and mine planners, this approach reduces unplanned inflows, avoids costly retrofits and supports more reliable ground support and excavation sequencing.

    Mining
    about 10 hours ago

    JordProxa at Lilac’s Great Salt Lake DLE plant: process design notes for engineers

    JordProxa has been selected as technology and equipment partner for Lilac Solutions’ Phase 1 commercial lithium carbonate plant on Utah’s Great Salt Lake, which targets 5,000 t/y of battery-grade lithium carbonate using direct lithium extraction. The partnership covers the downstream conversion process, integrating JordProxa’s thermal and process equipment with Lilac’s ion-exchange DLE system. First lithium production is planned for 2028, signalling a move from pilot-scale brine processing to a full commercial facility in a chemically complex salt-lake environment.

    Mining
    about 10 hours ago

    Orica Digital Solutions’ Axis Mining support in North Bay: reliability gains for drill teams

    Orica Digital Solutions has opened an Axis Mining Technology Technical Support & Service Centre in North Bay, Ontario, extending on-the-ground backing for its orebody intelligence systems to Canadian and wider North American mines. The facility will support deployment and maintenance of Axis downhole navigation and drillhole survey tools, improving turnaround for calibration, repairs and firmware updates that previously relied on distant service hubs. For geologists and drill and blast teams, closer support should reduce downtime on production and definition drilling and enable more consistent high-precision orebody data.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy